 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/03/2020 |
220403882 |
12 |
NB |
P APPROVED |
06/29/2020 |
|
MAGNUSSO |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED:TWELVE STORY MIXED-USE NEW BUILDIN
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 05/27/2020 |
220690223 |
02 |
A2 |
P APPROVED |
06/17/2020 |
|
PARAB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 11/06/2019 |
220403882 |
11 |
NB |
P APPROVED |
11/19/2019 |
|
MAGNUSSO |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 08/22/2019 |
220690223 |
01 |
A2 |
X SIGNED OFF |
10/05/2020 |
0014767 RA |
PARAB |
|
NOT APPLICABLE
|
|
PROPOSED MEDICAL OFFICES INCLUDES PRIMARY CARE AND URGENT CARE,
|
|
Work on Floor(s): 001
|
| 03/07/2019 |
220403882 |
10 |
NB |
P APPROVED |
03/19/2019 |
|
MAGNUSSO |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 02/15/2019 |
220471184 |
02 |
A2 |
P APPROVED |
02/15/2019 |
|
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 02/14/2019 |
220403882 |
09 |
NB |
P APPROVED |
02/19/2019 |
|
MAGNUSSO |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 12/20/2018 |
220678176 |
01 |
A2 |
J P/E DISAPPROVED |
12/28/2018 |
0014767 RA |
PARAB |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/11/2019 PROPOSED MEDICAL OFFICES INCLUDES PRIMARY CARE AN
|
|
Work on Floor(s): 001
|
| 12/10/2018 |
240190351 |
02 |
A2 |
P APPROVED |
12/12/2018 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 12/07/2018 |
220446676 |
02 |
A2 |
P APPROVED |
12/26/2018 |
|
SIDERIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 12/07/2018 |
220403882 |
08 |
NB |
P APPROVED |
01/30/2019 |
0065574 PE |
SIDERIS |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
| 09/26/2018 |
220669042 |
01 |
A3 |
X SIGNED OFF |
06/04/2019 |
0014993 RA |
MAGNUSSO |
|
NOT APPLICABLE
|
|
PROPOSED: FIRE PROTECTION PLAN IN CONJUNCTION WITH NB # 220403882. NO CHAN
|
|
Work on Floor(s): 001 thru 012
|
| 11/13/2017 |
220619178 |
01 |
A2 |
X SIGNED OFF |
01/29/2019 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
INSTALL NEW BOILER IN CONJUNCTION WITH NEW BUILDING # 220403882. NO CHANG
|
|
Work on Floor(s): ROF
|
| 09/20/2017 |
220403882 |
07 |
NB |
P APPROVED |
10/12/2017 |
0065574 PE |
SIDERIS |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
| 07/13/2017 |
240190351 |
01 |
A2 |
X SIGNED OFF |
12/14/2018 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRE
|
|
Work on Floor(s): ROF
|
| 12/29/2016 |
220483947 |
03 |
A3 |
P APPROVED |
12/29/2016 |
|
ACAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/02/2016 |
220455549 |
02 |
A3 |
P APPROVED |
11/02/2016 |
|
AHMED |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 11/02/2016 |
220558037 |
01 |
A3 |
X SIGNED OFF |
02/07/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF OVERHEAD/ROOF PROTECTION AS PER PLANS DURING GENERAL
|
|
Work on Floor(s): OSP
|
| 10/24/2016 |
220483947 |
02 |
A3 |
P APPROVED |
10/24/2016 |
|
ACAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/19/2016 |
220483947 |
01 |
A3 |
X SIGNED OFF |
01/08/2019 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTIO
|
|
Work on Floor(s): OSP
|
| 09/27/2016 |
220552480 |
01 |
A3 |
X SIGNED OFF |
01/07/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF A DEBRIS CHUTE AS PER PLANS IN CONJUNCTION WITH NB CONSTRU
|
|
Work on Floor(s): 001 thru 009
|
| 09/15/2016 |
220456673 |
02 |
A3 |
P APPROVED |
09/15/2016 |
|
CLARKE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 04/01/2016 |
220524252 |
01 |
SC |
U COMPLETED |
07/27/2016 |
0014993 RA |
MAGNUSSO |
|
NOT APPLICABLE
|
|
THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 19 INTO THREE (3) CONDO
|
| 03/24/2016 |
240135947 |
01 |
A3 |
X SIGNED OFF |
11/14/2018 |
0066720 PE |
HUANG |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): FAC
|
| 03/24/2016 |
240135849 |
01 |
A3 |
X SIGNED OFF |
06/25/2018 |
0066720 PE |
HUANG |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): FAC
|
| 03/06/2016 |
240134546 |
01 |
A3 |
H P/E IN PROCESS |
03/06/2016 |
0066720 PE |
HUANG |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/05/2016 PROPOSED INSTALLATION OF PIPE SCAFFOLDING AND MATE
|
|
Work on Floor(s): FAC
|
| 10/13/2015 |
220456673 |
01 |
A3 |
X SIGNED OFF |
01/23/2019 |
0079403 PE |
CLARKE |
|
NOT APPLICABLE
|
|
INSTALLATION OF A PERSONNEL/MATERIAL HOIST AS PER PLANS DURING NB CONSTRUC
|
|
Work on Floor(s): OSP
|
| 08/07/2015 |
220403882 |
06 |
NB |
P APPROVED |
08/10/2015 |
|
MAGNUSSO |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 07/30/2015 |
220471184 |
01 |
A2 |
X SIGNED OFF |
06/17/2019 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
FILING FOR TEMPORARY STANDPIPE IN CONJUNCTION WITH NB 220403882
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 07/10/2015 |
220403882 |
05 |
NB |
P APPROVED |
07/22/2015 |
|
MAGNUSSO |
|
GRANTED 06/26/2015
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED:TWELVE STORY MIXED-USE NEW BUILDIN
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 05/11/2015 |
220455549 |
01 |
A3 |
X SIGNED OFF |
01/07/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED APPROXIMATELY 356'LONG AS PER P
|
|
Work on Floor(s): 001
|
| 05/01/2015 |
220455059 |
01 |
A2 |
X SIGNED OFF |
06/04/2019 |
0066710 PE |
KEFALAS |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INSTALLATION OF AUTOMATIC SMOKE/HEAT/CARBON MONOXIDE
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
| 03/30/2015 |
220403882 |
04 |
NB |
X SIGNED OFF |
06/08/2021 |
0074354 PE |
WANG |
|
GRANTED 06/26/2015
|
|
PROPOSED: SOE WORK.
|
|
Work on Floor(s): OSP
|
| 03/24/2015 |
220446676 |
01 |
A2 |
X SIGNED OFF |
07/12/2019 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
PROPOSED: INSTALLATION OF A COMBINED SPRINKLER AND STANDPIPE SYSTEM FILED
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 03/23/2015 |
240093536 |
01 |
A2 |
D A/P ENTIRE |
03/23/2015 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/27/2015 PROPOSED: INSTALLATION OF A COMBINED SPRINKLER AN
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 03/18/2015 |
220412079 |
01 |
DM |
X SIGNED OFF |
07/20/2015 |
0074354 PE |
WANG |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF A 1 STORY WAREHOUSE
|
|
Work on Floor(s): 001
|
| 02/27/2015 |
240090806 |
01 |
A2 |
D A/P ENTIRE |
02/27/2015 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/27/2015 PROPOSED: INSTALLATION OF A COMBINED SPRINKLER AN
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 012
|
| 02/27/2015 |
220427857 |
01 |
A3 |
X SIGNED OFF |
10/15/2019 |
0059461 PE |
GALLI |
|
NOT APPLICABLE
|
|
PROPOSED: INSTALLATION OF 534.32 LINEAR FEET OF BUILDING PAVEMENT, IN
|
|
Work on Floor(s): OSP
|
| 09/22/2014 |
220403882 |
03 |
NB |
X SIGNED OFF |
06/08/2021 |
0065574 PE |
SIDERIS |
|
GRANTED 06/26/2015
|
|
PROPOSED: MECHANICAL AND PLUMBING WORK
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|
| 09/09/2014 |
220403882 |
02 |
NB |
X SIGNED OFF |
06/08/2021 |
0062161 PE |
OKOLSKI |
|
GRANTED 06/26/2015
|
|
PROPOSED: STRUCTURAL AND FOUNDATION WORK.
|
|
Work on Floor(s): CEL,ROF 001 thru 012
|