| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/03/2012 |
201131649 |
16 |
NB |
P APPROVED |
08/23/2012 |
|
Newman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 012
|
| 11/04/2010 |
201131649 |
15 |
NB |
P APPROVED |
02/01/2011 |
|
Newman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 012
|
| 08/05/2010 |
201131649 |
14 |
NB |
P APPROVED |
08/06/2010 |
0060229 PE |
Brooker |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 012
|
| 07/27/2010 |
201131649 |
13 |
NB |
P APPROVED |
08/06/2010 |
|
Newman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 012
|
| 07/07/2010 |
220071044 |
01 |
A3 |
X SIGNED OFF |
12/09/2011 |
0015609 RA |
NEWMAN |
|
NOT APPLICABLE
|
|
IT IS PROPOSED TO FILE A FIRE PROTECTION PLAN IN CONJUNCTION WITH THE NEW
|
|
Work on Floor(s): 001 thru 012
|
| 06/04/2010 |
201131649 |
12 |
NB |
P APPROVED |
06/14/2010 |
0060229 PE |
Brooker |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02 A NEW 12 STORY BUILDING @ 2238 CRESTON AVE.
|
|
Work on Floor(s): 001 thru 012
|
| 05/28/2010 |
201131649 |
11 |
NB |
P APPROVED |
05/28/2010 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03 INSTALL NEW PLUMBING IN NEW BUILDING.
|
|
Work on Floor(s): 001 thru 012
|
| 04/16/2010 |
201131649 |
10 |
NB |
P APPROVED |
05/21/2010 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 001 thru 012
|
| 03/09/2010 |
210033097 |
02 |
A2 |
D A/P ENTIRE |
03/09/2010 |
|
DiBari |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/03/2010
|
|
Work on Floor(s): ROF 001 thru 012
|
| 02/09/2010 |
201131649 |
09 |
NB |
P APPROVED |
02/19/2010 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03 INSTALLATION OF PLUMBING WWORK THROUGHOUT T
|
|
Work on Floor(s): 001 thru 012
|
| 02/08/2010 |
201131649 |
08 |
NB |
P APPROVED |
02/24/2010 |
0015609 RA |
Newman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 012
|
| 01/15/2010 |
201131649 |
07 |
NB |
P APPROVED |
01/21/2010 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03 INSTALLATION OF MECHANICAL SYSTEM THROUGHOU
|
|
Work on Floor(s): 001 thru 012
|
| 01/06/2010 |
220036066 |
02 |
A2 |
G PAA FEE DUE |
01/06/2010 |
|
DIBARI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/07/2010
|
|
Work on Floor(s): ROF
|
| 11/09/2009 |
220036066 |
01 |
A2 |
X SIGNED OFF |
12/06/2011 |
0077133 PE |
QURESHI |
|
NOT APPLICABLE
|
|
FILING BOILER APPLICATION IN CONJUNCTION WITH NB# 201131649. NO CHANGE IN
|
|
Work on Floor(s): ROF
|
| 11/06/2009 |
210033088 |
02 |
A2 |
P APPROVED |
11/25/2009 |
|
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 012
|
| 05/11/2009 |
220006197 |
01 |
A3 |
X SIGNED OFF |
02/02/2011 |
0071338 PE |
QURESHI |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD APPROXIMATELY 48'LONG BY 79'-96'HIGH DURING NEW
|
|
Work on Floor(s): GRD
|
| 03/18/2009 |
210115301 |
01 |
A3 |
X SIGNED OFF |
08/11/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR NEW BUILDING
|
|
Work on Floor(s): OSP
|
| 01/09/2009 |
201131649 |
06 |
NB |
P APPROVED |
01/22/2009 |
|
Newman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 012
|
| 11/14/2008 |
201131649 |
05 |
NB |
P APPROVED |
11/18/2008 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 001 thru 012
|
| 09/12/2008 |
210068111 |
01 |
A3 |
X SIGNED OFF |
12/02/2011 |
0035385 PE |
WELDIN |
|
NOT APPLICABLE
|
|
HERE TO FILE AND OBTAIN PERMISSION TO USE 6,000LBS HOIST WITH CONJUNCTION
|
|
Work on Floor(s): GRD,ROF 001 thru 012
|
| 08/07/2008 |
201131649 |
04 |
NB |
P APPROVED |
09/26/2008 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): 001 thru 012
|
| 08/05/2008 |
210062518 |
01 |
A3 |
X SIGNED OFF |
05/18/2010 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 90 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL RE
|
|
Work on Floor(s): OSP
|
| 02/06/2008 |
210033097 |
01 |
A2 |
X SIGNED OFF |
08/17/2010 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
It is proposed to install new fire alarm systems in conjunction with new
|
|
Work on Floor(s): ROF 001 thru 012
|
| 02/06/2008 |
210033088 |
01 |
A2 |
X SIGNED OFF |
02/28/2011 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
It is proposed to install new sprinkler and stanpipe systems in conjunctio
|
|
Work on Floor(s): ROF 001 thru 012
|
| 01/30/2008 |
210037155 |
01 |
A3 |
X SIGNED OFF |
09/20/2011 |
0015609 RA |
Newman |
|
NOT APPLICABLE
|
|
It is proposed to file Builders PAving Plan in conjunction with new buildi
|
|
Work on Floor(s): OSP
|
| 12/07/2007 |
201131649 |
03 |
NB |
X SIGNED OFF |
09/12/2012 |
0062063 PE |
DiBari |
|
NOT APPLICABLE
|
|
INSTALL NEW PLUMBING IN NEW BUILDING.
|
|
Work on Floor(s): 001 thru 012
|
| 12/07/2007 |
201131649 |
02 |
NB |
X SIGNED OFF |
09/12/2012 |
0060229 PE |
Brooker |
|
NOT APPLICABLE
|
|
A NEW 12 STORY BUILDING @ 2238 CRESTON AVE., BRONX.
|
|
Work on Floor(s): 001 thru 012
|
| 06/28/2007 |
201131006 |
01 |
DM |
X SIGNED OFF |
05/06/2008 |
|
FERRANDI |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 06/14/2007 |
201131649 |
01 |
NB |
X SIGNED OFF |
09/12/2012 |
0015609 RA |
Newman |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001 thru 012
|
| 06/14/2007 |
201130999 |
01 |
DM |
X SIGNED OFF |
05/12/2008 |
|
FERRANDI |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001,002
|