| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 05/30/2018 |
240223986 |
PR |
E LAA FILED |
05/30/2018 |
MP 000161 |
LEVINE |
|
JOB CLOSED 12 27 2018
|
|
Work on Floor(s): 001
|
| 02/15/2017 |
240173584 |
PR |
I LAA SIGNED OFF |
06/27/2017 |
FSC 000177 |
BOWER |
|
REARRANGE (13) EXISTING SPRINKLER HEADS USING APPROXIMATELY 45'-0" OF 1" P
|
|
Work on Floor(s): 001
|
| 11/29/2016 |
240164905 |
PR |
I LAA SIGNED OFF |
03/01/2017 |
FSC 000177 |
BOWER |
|
INSTALLATION OF (4) NEW SPRINKLER HEADS USING APPROXIMATELY 36'-0" OF 1" P
|
|
Work on Floor(s): 001
|
| 10/20/2016 |
240160945 |
PR |
I LAA SIGNED OFF |
01/08/2018 |
FSC 000177 |
BOWER |
|
INSTALLATION OF (1) NEW HEAD USING APPROXIMATELY 9'-0" OF 1" PIPING AND
|
|
Work on Floor(s): 003
|
| 08/05/2016 |
240151839 |
PR |
I LAA SIGNED OFF |
12/23/2016 |
FSC 000177 |
BOWER |
|
REARRANGE (11) SPRINKLER HEADS IN THE EZ FIX SPACE (SPACE #123A) USING
|
|
Work on Floor(s): 001
|
| 04/23/2016 |
240139970 |
PR |
I LAA SIGNED OFF |
10/06/2016 |
FSC 000177 |
BOWER |
|
INSTALLATION OF (1) NEW SPRINKLER HEAD USING APPROXIMATELY 10'-0" OF 1" PI
|
|
Work on Floor(s): 003
|
| 02/10/2016 |
240131923 |
PR |
I LAA SIGNED OFF |
05/12/2016 |
FSC 000177 |
BOWER |
|
REARRANGE (15) EXISTING SPRINKLER HEADS USING APPROXIMATELY 100'-0" OF 1"
|
|
Work on Floor(s): 001
|
| 12/21/2015 |
240127518 |
PR |
I LAA SIGNED OFF |
02/29/2016 |
FSC 000177 |
BOWER |
|
INSTALLATION OF (2) NEW SPRINKLER HEADS USING APPROXIMATELY 20'-0" OF 1" P
|
|
Work on Floor(s): 003
|
| 11/24/2015 |
240124450 |
PR |
I LAA SIGNED OFF |
12/04/2015 |
FSC 000934 |
LANDOLFI |
|
REARRANGEMENT OF 5 SPRINKLER HEADS IN THIRD FLOOR STORAGE ROOM. APPROXIMAT
|
|
Work on Floor(s): 003
|
| 09/02/2015 |
240112454 |
PR |
I LAA SIGNED OFF |
11/23/2015 |
FSC 000177 |
BOWER |
|
REARRANGE (17) SPRINKLER HEADS USING APPROXIMATELY 102'-0" 1" PIPING IN TH
|
|
Work on Floor(s): 001
|
| 07/27/2015 |
240107834 |
PR |
I LAA SIGNED OFF |
04/28/2016 |
FSC 000177 |
BOWER |
|
REARRANGE (8) EXISTING SPRINKLER HEADS FOR THAI MAX ON 3RD FLOOR USING
|
|
Work on Floor(s): 003
|
| 07/27/2015 |
240107825 |
PR |
I LAA SIGNED OFF |
04/28/2016 |
FSC 000177 |
BOWER |
|
REARRANGE (20) EXISTING SPRINKLER HEADS IN SUITE 311C USING APPROXIMATELY
|
|
Work on Floor(s): 003
|
| 05/11/2015 |
240098666 |
PR |
I LAA SIGNED OFF |
04/28/2016 |
FSC 000177 |
BOWER |
|
REARRANGE (1) SPRINKLER HEAD AND INSTALLATION OF (2) NEW SPRINKLER HEADS U
|
|
Work on Floor(s): 003
|
| 04/21/2015 |
240096338 |
PR |
I LAA SIGNED OFF |
08/17/2016 |
FSC 000177 |
BOWER |
|
INSTALLATION OF (2) NEW SPRINKLER HEADS USING APPROX 16'-0" OF 1" PIPING A
|
|
Work on Floor(s): 003
|