Premises: 200 BAYCHESTER AVENUE BRONX BIN: 2120098    Block: 5141    Lot: 6

To start overview at new date, select Month:   Day:   Year:  

FILE DATE JOB # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT
05/30/2018 240223986 PR E LAA FILED 05/30/2018 MP 000161 LEVINE
 JOB CLOSED 12 27 2018
 Work on Floor(s): 001

02/15/2017 240173584 PR I LAA SIGNED OFF 06/27/2017 FSC 000177 BOWER
 REARRANGE (13) EXISTING SPRINKLER HEADS USING APPROXIMATELY 45'-0" OF 1" P
 Work on Floor(s): 001

11/29/2016 240164905 PR I LAA SIGNED OFF 03/01/2017 FSC 000177 BOWER
 INSTALLATION OF (4) NEW SPRINKLER HEADS USING APPROXIMATELY 36'-0" OF 1" P
 Work on Floor(s): 001

10/20/2016 240160945 PR I LAA SIGNED OFF 01/08/2018 FSC 000177 BOWER
 INSTALLATION OF (1) NEW HEAD USING APPROXIMATELY 9'-0" OF 1" PIPING AND
 Work on Floor(s): 003

08/05/2016 240151839 PR I LAA SIGNED OFF 12/23/2016 FSC 000177 BOWER
 REARRANGE (11) SPRINKLER HEADS IN THE EZ FIX SPACE (SPACE #123A) USING
 Work on Floor(s): 001

04/23/2016 240139970 PR I LAA SIGNED OFF 10/06/2016 FSC 000177 BOWER
 INSTALLATION OF (1) NEW SPRINKLER HEAD USING APPROXIMATELY 10'-0" OF 1" PI
 Work on Floor(s): 003

02/10/2016 240131923 PR I LAA SIGNED OFF 05/12/2016 FSC 000177 BOWER
 REARRANGE (15) EXISTING SPRINKLER HEADS USING APPROXIMATELY 100'-0" OF 1"
 Work on Floor(s): 001

12/21/2015 240127518 PR I LAA SIGNED OFF 02/29/2016 FSC 000177 BOWER
 INSTALLATION OF (2) NEW SPRINKLER HEADS USING APPROXIMATELY 20'-0" OF 1" P
 Work on Floor(s): 003

11/24/2015 240124450 PR I LAA SIGNED OFF 12/04/2015 FSC 000934 LANDOLFI
 REARRANGEMENT OF 5 SPRINKLER HEADS IN THIRD FLOOR STORAGE ROOM. APPROXIMAT
 Work on Floor(s): 003

09/02/2015 240112454 PR I LAA SIGNED OFF 11/23/2015 FSC 000177 BOWER
 REARRANGE (17) SPRINKLER HEADS USING APPROXIMATELY 102'-0" 1" PIPING IN TH
 Work on Floor(s): 001

07/27/2015 240107834 PR I LAA SIGNED OFF 04/28/2016 FSC 000177 BOWER
 REARRANGE (8) EXISTING SPRINKLER HEADS FOR THAI MAX ON 3RD FLOOR USING
 Work on Floor(s): 003

07/27/2015 240107825 PR I LAA SIGNED OFF 04/28/2016 FSC 000177 BOWER
 REARRANGE (20) EXISTING SPRINKLER HEADS IN SUITE 311C USING APPROXIMATELY
 Work on Floor(s): 003

05/11/2015 240098666 PR I LAA SIGNED OFF 04/28/2016 FSC 000177 BOWER
 REARRANGE (1) SPRINKLER HEAD AND INSTALLATION OF (2) NEW SPRINKLER HEADS U
 Work on Floor(s): 003

04/21/2015 240096338 PR I LAA SIGNED OFF 08/17/2016 FSC 000177 BOWER
 INSTALLATION OF (2) NEW SPRINKLER HEADS USING APPROX 16'-0" OF 1" PIPING A
 Work on Floor(s): 003