Electrical Application Details for App #: B397890
NO JOBS FOUND WITH YOUR CRITERIA
Premises: 471 CLARKSON AVENUE BROOKLYN BIN: 3327712     Block: 4829   Lot: 1
   
Application Completed and Certified

Filed: 471 CLARKSON AV Census Tract:   808 Health Area:  5510
CELLAR Admin Area:   B - BROOKLYN Inspection Area:   G
BROOKLYN, NY 11203 Community Board:   309
DOB Cross Street(s):   NEW YORK AVENUE,    EAST 37 STREET
Status:   C - JOB IS SIGNED OFF 08/21/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  07/06/2015 4:15 PM
Application Entered:   07/06/2015 Job Start Date:   07/06/2015
Last Change:   08/21/2015 Job End Date:   09/02/2015
Appointment Status:   
Last Inspection By:   JEFFERSON, CHARLES       On     07/14/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011804 Licensee Name: JAMAL DUDLEY
Firm: 003415 Firm Name: DUDLEY & ASSOC. LIC. ELEC
Firm Phone: 718-588-2822  Firm Address: 6 EAST CLARK PLACE CONTR., INC. BRONX NY 10452 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $297.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   I - Hospital Or Health Facility
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: COLIN WHITE
Owner Business Name: EMPIRE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  3  
B. Over #2 to 1/0  1  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  1  A1 PHASE UP TO 20-1 OR 10
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  1  B 1 PHASE UP TO 20-1 OR
C. 3 Phase Up to 225 AMPS  2  C 3 PHASE UPN TO 225 AMPS
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
001  47  24    12  47             
Buildings Total 47  24    12  47                
Total Units : 130 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLATION OF POWER FOR LINAC ROOM WITH LIGHTS AND PIPES FOR LOW VOLTAGE SIGNALING. FEED POWER CONDITIONER THEN FEED 2 SWITCHES IN CONTROL ROOM FROM CONDITIONER (MAIN) & (OBI) AND SMALL PANEL 4 CKT. FEED DISCONNECT SWITCH FROM ELECTRIC ROOM TO CONTROL ROOM FOR LINAC/LASER POWER.

 
Inspection Details
 

*NO JOBS FOUND WITH YOUR CRITERIA
INSPECTION FOR APPLICATION #: B397890
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/14/2015 07/23/2015 CJE C (35) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Pre-BIS PA CO Query By Bin  |  Electrical Inspection Work Order  |  Electrical Applications  |  Back