 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/18/2012 |
220134290 |
02 |
A2 |
P APPROVED |
06/18/2012 |
|
DUPUY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 08/31/2011 |
220101510 |
02 |
A2 |
D A/P ENTIRE |
08/31/2011 |
|
DEPASQUA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/28/2012
|
|
Work on Floor(s): ROF 001 thru 008
|
| 08/31/2011 |
220038778 |
03 |
A2 |
D A/P ENTIRE |
08/31/2011 |
|
DEPASQUA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/09/2012
|
|
Work on Floor(s): 001 thru 008
|
| 08/10/2011 |
220134290 |
01 |
A2 |
X SIGNED OFF |
06/19/2012 |
0014928 RA |
DUPUY |
|
NOT APPLICABLE
|
|
ALTERATION TYPE II IS BEING FILED HEREWITH TO INSTALL A THERMO ELECTRON TE
|
|
Work on Floor(s): ROF
|
| 07/01/2011 |
220032355 |
06 |
NB |
P APPROVED |
07/01/2011 |
|
DEPASQUA |
|
AMENDED 10/30/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 06/29/2011 |
220032355 |
05 |
NB |
P APPROVED |
06/29/2011 |
|
DEPASQUA |
|
AMENDED 10/30/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 06/22/2011 |
220032355 |
04 |
NB |
P APPROVED |
06/24/2011 |
|
DEPASQUA |
|
AMENDED 10/30/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 06/10/2011 |
220032355 |
03 |
NB |
P APPROVED |
06/16/2011 |
|
DEPASQUA |
|
AMENDED 10/30/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 04/15/2011 |
220038778 |
02 |
A2 |
P APPROVED |
04/19/2011 |
|
DEPASQUA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 01/21/2011 |
220101510 |
01 |
A2 |
X SIGNED OFF |
09/17/2012 |
0015324 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
INSTALL A SPRINKLER / SMOKE DETECTION SYSTEM
|
|
Work on Floor(s): 001 thru 008
|
| 09/13/2010 |
220077093 |
02 |
A3 |
P APPROVED |
09/13/2010 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/31/2010 |
220080445 |
01 |
A3 |
X SIGNED OFF |
07/08/2011 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A MATERIAL HOIST TOWER PER ATTACHED DRAWINGS. INSTALLATION SHALL CO
|
|
Work on Floor(s): OSP
|
| 08/12/2010 |
220077093 |
01 |
A3 |
X SIGNED OFF |
07/08/2011 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 521 LINEAR FEET BY 79 FEET APPROXIMATE HEIGHT OF TUBULAR
|
|
Work on Floor(s): OSP
|
| 06/14/2010 |
220067335 |
01 |
A3 |
X SIGNED OFF |
06/16/2011 |
0014908 RA |
COMPTON |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 207 L.F. AS PER PLAN A
|
|
Work on Floor(s): OSP
|
| 04/22/2010 |
220032355 |
02 |
NB |
P APPROVED |
03/28/2011 |
|
DEPASQUA |
|
AMENDED 10/30/2013
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 008
|
| 11/30/2009 |
220039045 |
01 |
A3 |
X SIGNED OFF |
10/21/2011 |
0015324 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
BUILDERS PAVEMENT IN CONJUNCTION WITH NEW BUILDING 220032355
|
|
Work on Floor(s): OSP
|
| 11/25/2009 |
220038778 |
01 |
A2 |
X SIGNED OFF |
03/08/2012 |
0015324 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
SPRINKLER AND STANDPIPE IN CONJUNCTION WITH NB 220032355
|
|
Work on Floor(s): 001 thru 008
|
| 10/16/2009 |
220032355 |
01 |
NB |
X SIGNED OFF |
10/12/2012 |
0015324 RA |
DEPASQUA |
|
AMENDED 10/30/2013
|
|
CONSTRUCT 84 UNIT MASONRY APARTMENT BUILDING, EIGHT STORIES HIGH. 21 PARKI
|
|
Work on Floor(s): 001 thru 008
|