| 01/08/2018 |
220631065 |
01 |
A2 |
X SIGNED OFF |
02/21/2018 |
0070963 PE |
KANTOR |
|
NOT APPLICABLE
|
|
HEREBY FILING TO REMOVE (1) EXISTING 500 GALLON HOT WATER STORAGE TANK AND
|
|
Work on Floor(s): ROF
|
| 02/06/2007 |
200805263 |
09 |
NB |
P APPROVED |
02/06/2007 |
0223111 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,OG, ROF 001 thru 013
|
| 10/24/2006 |
200820111 |
02 |
A2 |
P APPROVED |
10/27/2006 |
0066710 PE |
KEFALAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,OG 001 thru 013
|
| 10/20/2006 |
200805263 |
08 |
NB |
P APPROVED |
10/27/2006 |
0223111 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,OG, ROF 001 thru 013
|
| 08/09/2006 |
201070376 |
01 |
A3 |
X SIGNED OFF |
09/29/2006 |
0223111 RA |
QAIM-MAG |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR (2) TWO CURB CUTS(26'-0) EACH. FILED INCONJUNCTIO
|
|
Work on Floor(s): OSP
|
| 06/21/2006 |
200805263 |
07 |
NB |
P APPROVED |
06/28/2006 |
0223111 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 05/16/2005 |
200971500 |
01 |
A3 |
X SIGNED OFF |
05/05/2006 |
0078402 PE |
Blinn |
|
NOT APPLICABLE
|
|
Erect temporary Champ Single Personnel/Material Hoist in conj. with work
|
|
Work on Floor(s): 001
|
| 05/09/2005 |
200970244 |
01 |
A3 |
X SIGNED OFF |
07/14/2006 |
0077036 PE |
MOHAMMAD |
|
NOT APPLICABLE
|
|
WE SHALL INSTALL 65,0000 SQ FEET OF PIPE SCAFFOLDING AROUND 1514 SEDGWICK
|
|
Work on Floor(s): 001 thru 014
|
| 02/11/2005 |
200932731 |
01 |
A3 |
X SIGNED OFF |
04/28/2006 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 220' DURING NB CONSTRUCTION.
|
|
Work on Floor(s): 001
|
| 12/07/2004 |
200805263 |
06 |
NB |
P APPROVED |
12/10/2004 |
0223111 RA |
QAIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/24/2004 |
200805263 |
05 |
NB |
P APPROVED |
12/02/2004 |
0223111 RA |
QAIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 04/06/2004 |
200805263 |
04 |
NB |
P APPROVED |
04/13/2004 |
0223111 RA |
QAIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 01/06/2004 |
200817134 |
01 |
A2 |
X SIGNED OFF |
05/10/2006 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
HEREWITH FILING BIOLER WORK AS INDICATED ON PLANS. THIS WORK IS BEING
|
|
Work on Floor(s): CEL
|
| 12/18/2003 |
200820111 |
01 |
A2 |
X SIGNED OFF |
01/30/2007 |
0066710 PE |
KEFALAS |
|
NOT APPLICABLE
|
|
HEREWITH FILING A SPRINKLER ALARM SYSTEM AS INDICATED ON PLANS. THIS WO
|
|
Work on Floor(s): CEL,BAS,OG 001 thru 013
|
| 11/24/2003 |
200816395 |
01 |
A2 |
X SIGNED OFF |
06/13/2006 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
HEREWITH FILING STANDPIPE AND SPRINKLER WORK AS INDICATED ON PLANS. THI
|
|
Work on Floor(s): 001
|
| 11/19/2003 |
200805263 |
03 |
NB |
X SIGNED OFF |
02/06/2007 |
0223111 RA |
QAIM |
|
NOT APPLICABLE
|
|
STRUCTURAL
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/19/2003 |
200805263 |
02 |
NB |
X SIGNED OFF |
02/06/2007 |
0065574 PE |
SIDERIS |
|
NOT APPLICABLE
|
|
PLUMBING WORK
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 004
|
| 11/18/2003 |
200815573 |
01 |
A3 |
X SIGNED OFF |
06/30/2006 |
0074550 PE |
GHADRDAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR A BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH
|
|
Work on Floor(s): 001
|
| 09/08/2003 |
200805263 |
01 |
NB |
X SIGNED OFF |
02/06/2007 |
0223111 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,BAS,OG, ROF 001 thru 013
|
| 07/31/2003 |
200800767 |
01 |
A2 |
X SIGNED OFF |
08/01/2006 |
0054124 PE |
SMOLINSK |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR REGARDING AND SITE P REPARATION WORK AS INDICATED ON
|
|
Work on Floor(s): 001
|