| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/08/2023 |
240346201 |
01 |
A2 |
X SIGNED OFF |
08/15/2023 |
0081693 PE |
LEONE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG ROOFTOP. NO CHAGNES TO TH
|
| 04/08/2023 |
240346194 |
01 |
A2 |
D A/P ENTIRE |
04/08/2023 |
0081693 PE |
LEONE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/08/2023 INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITNG R
|
| 04/08/2023 |
240346185 |
01 |
A2 |
D A/P ENTIRE |
04/08/2023 |
0081693 PE |
LEONE |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 07/07/2023 INSTALLATION OFSOLAR PV SYSTEM ON EXISITNG ROOFTOP
|
| 03/01/1994 |
200219183 |
05 |
NB |
P APPROVED |
03/11/1994 |
0007721 RA |
FAKLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 12/01/1992 |
200219183 |
04 |
NB |
R PERMIT-ENTIRE |
03/08/1994 |
0056201 PE |
SHABUNIA |
|
NOT APPLICABLE
|
|
ALL DRAINAGE OUTSIDE AND INSIDE OF BLDG. IN CONNECTION TO SEWER.
|
|
Work on Floor(s): ___
|
| 09/04/1992 |
200219183 |
03 |
NB |
R PERMIT-ENTIRE |
01/14/1993 |
0056201 PE |
SHABUNIA |
|
NOT APPLICABLE
|
|
ADDING OT WORK TYPE.
|
|
Work on Floor(s): ___
|
| 09/04/1992 |
200219183 |
02 |
NB |
R PERMIT-ENTIRE |
01/14/1993 |
0020916 PE |
ATLAS |
|
NOT APPLICABLE
|
|
PILES & FOUNDATIONS NECESSARY TO ------- CONSTRUCT A 2 STORY AND CELLAR-
|
|
Work on Floor(s): ___
|
| 09/04/1992 |
200219183 |
01 |
NB |
X SIGNED OFF |
03/18/1994 |
0007721 RA |
FAKLER |
|
NOT APPLICABLE
|
|
200030171 |
01 |
SI |
J P/E DISAPPROVED |
04/12/1990 |
0182331 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/14/1994
|
|