 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/17/1999 |
200566725 |
01 |
A2 |
P APPROVED |
02/17/1999 |
0022018 RA |
JOHNSON |
|
NOT APPLICABLE
|
|
NEW 10'-0"X15'-0" DECK AT REAR FIRST FLO OR, RELOCATE EXISTING STAIRS.NO
|
|
Work on Floor(s): 001
|
| 03/30/1994 |
200219316 |
05 |
NB |
P APPROVED |
04/05/1994 |
0007721 RA |
FAKLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ___
|
| 12/07/1992 |
200219316 |
04 |
NB |
R PERMIT-ENTIRE |
07/27/1993 |
0056201 PE |
SHABUNIA |
|
NOT APPLICABLE
|
|
ALL DRAINAGE OUTSIDE AND INSIDE OF BUILDING IN CONNECTION TO SEWER.
|
|
Work on Floor(s): OSP
|
| 09/02/1992 |
200219316 |
03 |
NB |
R PERMIT-ENTIRE |
01/14/1993 |
0056201 PE |
SHABUNIA |
|
NOT APPLICABLE
|
|
SITE SANITARY AND STORM DRAINAGE NECESSA RY TO CONSTRUCT A THREE STORY
|
|
Work on Floor(s): ___
|
| 09/02/1992 |
200219316 |
02 |
NB |
R PERMIT-ENTIRE |
01/14/1993 |
0020916 PE |
ATLAS |
|
NOT APPLICABLE
|
|
PILES AND FOUNDATIONS NECESSARY TO CONST RUCT A TWO STORY AND CELLAR, CO
|
|
Work on Floor(s): ___
|
| 09/02/1992 |
200219316 |
01 |
NB |
X SIGNED OFF |
08/12/1994 |
0007721 RA |
FAKLER |
|
NOT APPLICABLE
|
|
Work on Floor(s): ___
|