| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/23/2012 |
220086243 |
02 |
A3 |
P APPROVED |
05/31/2012 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/21/2012 |
220089703 |
02 |
A3 |
P APPROVED |
05/24/2012 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/18/2012 |
220042004 |
02 |
A2 |
P APPROVED |
05/24/2012 |
|
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 003
|
| 10/28/2010 |
220089703 |
01 |
A3 |
X SIGNED OFF |
06/27/2012 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 10/05/2010 |
220086243 |
01 |
A3 |
X SIGNED OFF |
05/31/2012 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO C
|
|
Work on Floor(s): OSP
|
| 12/22/2009 |
220042004 |
01 |
A2 |
X SIGNED OFF |
05/29/2012 |
0075800 PE |
NARAGHI |
|
NOT APPLICABLE
|
|
REPAIRING THE BRICK FACADE AND ROOFING FLASHING REPLACEMENT. NO CHANGE IN
|
|
Work on Floor(s): 001 thru 003
|
| 10/19/2009 |
220032186 |
01 |
A2 |
X SIGNED OFF |
08/16/2011 |
0068293 PE |
BRADFORD |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INSTALLATION OF NON-GAS INSTANTANEOUS DOMESTIC HOT WAT
|
|
Work on Floor(s): CEL
|
| 07/06/2004 |
200867044 |
01 |
A2 |
R PERMIT-ENTIRE |
07/14/2004 |
0062079 PE |
Ferraro |
|
NOT APPLICABLE
|
|
Provide and install new water metres, and backflow prevention devices as s
|
|
Work on Floor(s): CEL
|