| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/04/2020 |
220138296 |
05 |
A2 |
P APPROVED |
03/10/2020 |
0082894 PE |
BEHAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 022
|
| 10/27/2016 |
240161542 |
01 |
A3 |
R PERMIT-ENTIRE |
11/05/2018 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 08/27/2014 |
220401544 |
01 |
A2 |
X SIGNED OFF |
09/23/2015 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL NEW GAS SERVICE, METER AND GAS PIPING AND CONNECT TO TWO (2) EXIST
|
|
Work on Floor(s): CEL,OSP
|
| 05/16/2014 |
220138296 |
04 |
A2 |
P APPROVED |
08/15/2019 |
0063292 PE |
GUILFOYL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 022
|
| 04/22/2014 |
220138296 |
03 |
A2 |
P APPROVED |
05/01/2014 |
|
GUILFOYL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 022
|
| 11/04/2013 |
220138296 |
02 |
A2 |
P APPROVED |
03/13/2014 |
|
GUILFOYL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,ROF 001 thru 022
|
| 09/13/2011 |
220138296 |
01 |
A2 |
X SIGNED OFF |
03/16/2020 |
0082894 PE |
BEHAN |
|
NOT APPLICABLE
|
|
FILING FOR FACADE REPAIRS AND THE INSTALLATION OF MASONRY ANCHORS THROUGHO
|
|
Work on Floor(s): OSP,ROF 001 thru 022
|
| 07/22/2010 |
220073328 |
01 |
A3 |
R PERMIT-ENTIRE |
08/21/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 10/24/2005 |
201004616 |
01 |
A3 |
X SIGNED OFF |
02/07/2007 |
0626681 PE |
WHELAN |
|
NOT APPLICABLE
|
|
FACADE REPAIR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001 thru 012
|
| 08/15/2005 |
200990598 |
01 |
A3 |
X SIGNED OFF |
10/31/2014 |
0060591 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 120' DURING FACADE REPAIR. NO C
|
|
Work on Floor(s): 001
|
| 08/08/2003 |
200801515 |
01 |
A3 |
X SIGNED OFF |
03/30/2004 |
0049515 PE |
LIEBERMA |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 08/21/2002 |
200748272 |
01 |
A3 |
X SIGNED OFF |
10/31/2014 |
0000000 OT |
Singh |
|
NOT APPLICABLE
|
|
Install heavy duty sidewalk shed 950ft long at 945 Underhill Avenue durin
|
|
Work on Floor(s): 001
|
| 01/31/2002 |
200429312 |
02 |
A2 |
P APPROVED |
01/31/2002 |
0024974 PE |
GALLIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 07/15/1997 |
200429312 |
01 |
A2 |
X SIGNED OFF |
04/02/2002 |
0024974 PE |
GALLIN |
|
NOT APPLICABLE
|
|
ERECT HANDICAPPED ACCESS RAMP AT NORTH F ACADE OF BUILDING.NO CHANGE IN
|
|
Work on Floor(s): 001
|
| 02/03/1997 |
200411009 |
01 |
A2 |
X SIGNED OFF |
07/14/2000 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE TWO BOILERS AND TWO BURNERS. NO CHANGE TO USE, EGRESS OR OCCUPAN
|
|
Work on Floor(s): CEL
|
| 03/22/1994 |
200285681 |
01 |
A2 |
X SIGNED OFF |
11/16/1995 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL 20,000 GALLON ABOVE GROUND OIL TANK AND TANK ENCLOSURE.
|
|
Work on Floor(s): CEL
|
| 03/27/1990 |
200029539 |
01 |
A1 |
P APPROVED |
08/20/1990 |
0027729 PE |
LICALZI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/01/2009 MINOR PARTITION WORK, MINOR PLUMBING WOR
|
|
Work on Floor(s): 1
|