| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/21/2023 |
220461809 |
04 |
A1 |
P APPROVED |
08/14/2023 |
0019534 RA |
GINSBERG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ENT
|
| 03/02/2023 |
220461809 |
03 |
A1 |
P APPROVED |
03/16/2023 |
|
GINSBERG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ENT
|
| 06/16/2021 |
220166816 |
02 |
A3 |
P APPROVED |
07/02/2021 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/28/2021
|
|
Work on Floor(s): OSP
|
| 01/14/2021 |
220600320 |
02 |
A2 |
P APPROVED |
02/12/2021 |
0001105 RA |
STARR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/30/2019 |
220600071 |
04 |
A2 |
P APPROVED |
08/02/2019 |
|
CARAVELL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/09/2019 |
220600071 |
03 |
A2 |
D A/P ENTIRE |
01/09/2019 |
|
CARAVELL |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/14/2019
|
|
Work on Floor(s): OSP
|
| 04/18/2018 |
220646120 |
01 |
A3 |
P APPROVED |
04/19/2018 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
FACADE SITE SAFETY PLAN (SSP) FILED IN CONJUNCTION WITH APPLICATION # 2206
|
|
Work on Floor(s): FAC,ROF
|
| 04/02/2018 |
220632064 |
01 |
A2 |
X SIGNED OFF |
01/23/2020 |
0028770 RA |
SANTELLI |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AND ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE
|
|
Work on Floor(s): ROF,FAC
|
| 06/06/2017 |
220600320 |
01 |
A2 |
X SIGNED OFF |
08/19/2021 |
0001105 RA |
STARR |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO PERFORM LANDSCAPE WORK. WORK TO INCLUDE NEW PLANTING
|
|
Work on Floor(s): OSP
|
| 06/02/2017 |
220600071 |
02 |
A2 |
X SIGNED OFF |
08/22/2019 |
0038277 RA |
PELLON |
|
NOT APPLICABLE
|
|
ERECT TEMPORARY CONSTRUCTION FENCE AS SHOWN ON PLANS.
|
|
Work on Floor(s): OSP
|
| 06/02/2017 |
220600071 |
01 |
A2 |
X SIGNED OFF |
08/22/2019 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
CIVIL WORK AND INSTALLATION OF NEW DRAINAGE IN CONJUNCTION WITH LANDSCAPE
|
|
Work on Floor(s): OSP
|
| 01/05/2017 |
220577043 |
01 |
A3 |
R PERMIT-ENTIRE |
09/05/2017 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
CURB CUT APPLICATION (LOT 20)
|
|
Work on Floor(s): OSP
|
| 06/10/2016 |
220535678 |
01 |
A3 |
R PERMIT-ENTIRE |
08/22/2016 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
INSTALL NEW CURB CUT (WEST).
|
|
Work on Floor(s): OSP
|
| 06/10/2016 |
220535687 |
01 |
A3 |
R PERMIT-ENTIRE |
08/22/2016 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
INSTALL NEW EAST CURB CUT (LOT 20).
|
|
Work on Floor(s): OSP
|
| 01/15/2016 |
220512167 |
01 |
A2 |
X SIGNED OFF |
11/18/2016 |
0089624 PE |
CARAVELL |
|
NOT APPLICABLE
|
|
FILING TO REARRANGE PARKING LOT LAYOUT AND ACCESS. REBUILDING EXISTING CUR
|
|
Work on Floor(s): OSP
|
| 12/17/2015 |
220461809 |
02 |
A1 |
P APPROVED |
01/23/2017 |
|
GINSBERG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ENT
|
| 06/08/2015 |
220461809 |
01 |
A1 |
X SIGNED OFF |
08/15/2023 |
0019534 RA |
GINSBERG |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO SHOW NEW METES AND BOUNDS FOR SUBDIVIDED ZONING LOT.
|
|
Work on Floor(s): ENT
|
| 06/24/2014 |
220190460 |
02 |
A2 |
P APPROVED |
06/24/2014 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BMT,MEC,RM
|
| 10/22/2013 |
220330728 |
04 |
A2 |
P APPROVED |
12/12/2013 |
|
CANE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REQUESTING APPROVAL OF AMENDED & NEW DRAWIN
|
|
Work on Floor(s): 001,OSP
|
| 10/21/2013 |
220341770 |
01 |
A2 |
X SIGNED OFF |
11/30/2015 |
0086145 PE |
CROCKER |
|
NOT APPLICABLE
|
|
SITE WORK, CONSTRUCTION OF EXTERIOR STAIR & HANDICAP RAMP AND REPLACEMENT
|
|
Work on Floor(s): OSP
|
| 08/19/2013 |
220330728 |
03 |
A2 |
X SIGNED OFF |
12/29/2015 |
0063714 PE |
DUNNE |
|
NOT APPLICABLE
|
|
INSTALL STEEL FRAMING & ANCHORS FOR NEW CANOPY
|
|
Work on Floor(s): 001,OSP
|
| 08/19/2013 |
220330728 |
02 |
A2 |
X SIGNED OFF |
12/29/2015 |
0043334 PE |
KUNSTADT |
|
NOT APPLICABLE
|
|
REPLACE LOBBY STEAM CONVECTORS
|
|
Work on Floor(s): 001
|
| 08/19/2013 |
220330728 |
01 |
A2 |
X SIGNED OFF |
12/29/2015 |
0012224 RA |
CANE |
|
NOT APPLICABLE
|
|
REQUESTING APPROVAL OF AMENDED & NEW DRAWINGS FILED HEREWITH.
|
|
Work on Floor(s): 001,OSP
|
| 06/18/2012 |
220190460 |
01 |
A2 |
X SIGNED OFF |
07/16/2014 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
INSTALL (2) NEW GAS FIRED DIRECT VENT HOT WATER HEATERS FOR DOMESTIC WATER
|
|
Work on Floor(s): BMT,MEC,RM
|
| 02/16/2012 |
220166816 |
01 |
A3 |
R PERMIT-ENTIRE |
05/02/2012 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/28/2021 INSTALLATION OF 1131 LINEAR FEET OF HEAVY DUTY SI
|
|
Work on Floor(s): OSP
|
| 09/18/2009 |
220028413 |
01 |
A2 |
X SIGNED OFF |
03/03/2011 |
0069119 PE |
KAZIMIER |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR EXTERIOR AND ROOF REPAIRS AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): EXT
|
| 06/09/2004 |
200861610 |
01 |
A2 |
P APPROVED |
06/18/2004 |
0061831 PE |
CATTAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/11/2019 HEREWITH FILING FOR FACADE REPAIRS AS IN DICATED
|
|
Work on Floor(s): 001
|
| 09/10/2002 |
200750099 |
01 |
A3 |
X SIGNED OFF |
06/28/2011 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED , 1140', DURING FACADE REPAIR.
|
|
Work on Floor(s): 001
|
| 12/24/2001 |
200706067 |
01 |
A2 |
P APPROVED |
01/03/2002 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/11/2019 INSTALL GAS FIRED COGNERATION PLANT AND RELATED E
|
|
Work on Floor(s): 001
|
| 01/22/1991 |
200101781 |
01 |
A3 |
X SIGNED OFF |
09/22/2004 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
REQUEST TO ERECT SHED OF 350' ON BOYNTON AVE DURING FACEDE REPAIR. NO
|
|
Work on Floor(s): 1
|