| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/03/2019 |
240261505 |
01 |
A2 |
X SIGNED OFF |
11/06/2019 |
0058384 PE |
MILLMAN |
|
NOT APPLICABLE
|
|
THROGGS NECK HOUSES, BLDG # 23, ELEVATOR SHAFT STRUCTURE REPAIRS INCLUDING
|
|
Work on Floor(s): ROF,BLK,FAC
|
| 10/03/2017 |
240201134 |
01 |
A3 |
X SIGNED OFF |
03/05/2018 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD (+/-) 372'-0" LONG AND (+/-) 15'-0" HIGH ON
|
|
Work on Floor(s): OSP
|
| 09/28/2017 |
240115861 |
02 |
A3 |
P APPROVED |
10/02/2017 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/23/2017 |
240195855 |
01 |
A3 |
X SIGNED OFF |
03/05/2018 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF (+/-) 1305 L.FT TEMPORARY CONSTRUCTION FENCE AS INDICATED
|
|
Work on Floor(s): OSP
|
| 08/15/2017 |
240194598 |
01 |
A2 |
X SIGNED OFF |
05/14/2018 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE
|
|
Work on Floor(s): 001 thru 007
|
| 08/08/2017 |
240115807 |
02 |
A3 |
P APPROVED |
08/09/2017 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/07/2017 |
240193358 |
01 |
A3 |
X SIGNED OFF |
03/05/2018 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF (+/-)395 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS. THE
|
|
Work on Floor(s): OSP
|
| 10/12/2015 |
240117725 |
01 |
A2 |
H P/E IN PROCESS |
10/12/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/06/2015 FACADE RESTORATION WORK AS PER INDICATED ON PLAN.
|
|
Work on Floor(s): 001 thru 007
|
| 10/01/2015 |
240116325 |
01 |
A2 |
H P/E IN PROCESS |
10/01/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/30/2015 FACADE REPAIR WORK AS PER PLANS.THERE WILL BE NO C
|
|
Work on Floor(s): 001 thru 007
|
| 09/28/2015 |
240115861 |
01 |
A3 |
X SIGNED OFF |
10/03/2017 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF CHAIN-LINK FENCE AS PER PLANS. WORK SHALL COMPLY WITH 2014
|
|
Work on Floor(s): OSP
|
| 09/28/2015 |
240115807 |
01 |
A3 |
X SIGNED OFF |
08/10/2017 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 02/06/2014 |
220065202 |
02 |
A3 |
P APPROVED |
03/06/2014 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/13/2012 |
220041283 |
05 |
A2 |
P APPROVED |
09/13/2012 |
0024406 PE |
BRAZOBAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 007
|
| 06/15/2011 |
220041283 |
04 |
A2 |
P APPROVED |
06/21/2011 |
|
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 007
|
| 06/15/2011 |
220041283 |
03 |
A2 |
P APPROVED |
06/15/2011 |
|
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 007
|
| 03/30/2011 |
220072196 |
02 |
A3 |
P APPROVED |
04/28/2011 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/23/2010 |
220078939 |
01 |
A3 |
X SIGNED OFF |
02/24/2011 |
0071297 PE |
FARUQI |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL
|
|
Work on Floor(s): OSP
|
| 07/22/2010 |
220041283 |
02 |
A2 |
P APPROVED |
06/15/2011 |
|
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 007
|
| 07/14/2010 |
220072196 |
01 |
A3 |
X SIGNED OFF |
04/29/2011 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
INSTALLATION OF A 39 FEET HIGH PIPE SCAFFOLD AT WATER TANK AS PER DRAWINGS
|
|
Work on Floor(s): OSP
|
| 06/18/2010 |
220068398 |
01 |
A3 |
X SIGNED OFF |
02/28/2011 |
0071297 PE |
FARUQI |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLDING AS INDICATED ON PLANS. THERE WILL BE NO C
|
|
Work on Floor(s): OSP
|
| 06/17/2010 |
220068030 |
01 |
A3 |
X SIGNED OFF |
10/24/2011 |
0016966 RA |
GALLO |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 72'L X 8'H X8'W, 72'L X 8'H X 8'W
|
|
Work on Floor(s): GRD
|
| 06/01/2010 |
220065202 |
01 |
A3 |
X SIGNED OFF |
03/14/2014 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
WE SHALL INSTALL ABOUT 128 LF OF TEMPORARY CONSTRUCTION FENCE AT THE BUIL
|
|
Work on Floor(s): OSP
|
| 12/17/2009 |
220041283 |
01 |
A2 |
X SIGNED OFF |
05/22/2013 |
0024406 PE |
BRAZOBAN |
|
NOT APPLICABLE
|
|
REPAIRING THE BRICK FACADE AND ROOFING REPLACEMENT. NO CHANGE IN USE, EG
|
|
Work on Floor(s): 001 thru 007
|
| 10/19/2009 |
220031891 |
01 |
A2 |
X SIGNED OFF |
07/18/2011 |
0068293 PE |
BRADFORD |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INSTALLATION OF NON-GAS INSTANTANEOUS DOMESTIC HOT WAT
|
|
Work on Floor(s): CEL
|
| 05/01/2008 |
210048045 |
01 |
A3 |
R PERMIT-ENTIRE |
04/18/2011 |
0075384 PE |
TOMS |
|
NOT APPLICABLE
|
|
CREATING A TELECOMMUNICATION EQUIPMENT ROOM IN THE BASEMENT.RELATED HVAC U
|
|
Work on Floor(s): ROF,FAC,BAS
|
| 04/28/2008 |
210047457 |
01 |
A3 |
X SIGNED OFF |
07/13/2010 |
0071297 PE |
FARUQI |
|
NOT APPLICABLE
|
|
WE WILL INSTALL 412 LFT OF SIDEWALK SHED AT 2830 SCHLEY AVENUE, BRONX, NY
|
|
Work on Floor(s): 1 thru 6
|
| 04/19/2007 |
201119468 |
01 |
A2 |
X SIGNED OFF |
06/02/2010 |
0051875 PE |
MCNEVIN |
|
NOT APPLICABLE
|
|
FACADE REPAIR.NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): 001 thru 007
|
| 07/07/2004 |
200867516 |
01 |
A2 |
R PERMIT-ENTIRE |
07/27/2004 |
0062079 PE |
Ferraro |
|
NOT APPLICABLE
|
|
Provide and install new water meters, two house pumps and backflow prevent
|
|
Work on Floor(s): CEL
|
| 07/18/1997 |
200429704 |
01 |
A3 |
R PERMIT-ENTIRE |
08/01/1997 |
|
LAMENDOL |
|
NOT APPLICABLE
|
|
ERECT 166 FT OF HEAVY DUTY SIDEWALK SHED FOR REPAIR OF FACADE 68 FT AT
|
|
Work on Floor(s): GRD
|
| 05/11/1995 |
200324265 |
01 |
A2 |
R PERMIT-ENTIRE |
03/29/1996 |
0020765 RA |
ARCARI |
|
NOT APPLICABLE
|
|
MODIFICATION OF APTS. FOR HANDICAPPED - ACCESSIBILITY. NO CHANGE IN OC
|
|
Work on Floor(s): 4
|