| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/23/2020 |
240188756 |
03 |
A3 |
P APPROVED |
07/15/2020 |
0019131 RA |
DOOLING |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/09/2019 |
240188756 |
02 |
A3 |
P APPROVED |
07/15/2019 |
|
BAILEY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/13/2017 |
240202687 |
01 |
A2 |
R PERMIT-ENTIRE |
04/11/2018 |
0016284 RA |
TORABY |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR EXTERIOR FACADE REPAIRS AS PER PLANS SUBMITTED NO CHANGE
|
|
Work on Floor(s): ROF 001 thru 006
|
| 06/28/2017 |
240188756 |
01 |
A3 |
X SIGNED OFF |
07/23/2020 |
0019131 RA |
DOOLING |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 03/04/2016 |
220468615 |
02 |
A3 |
P APPROVED |
03/08/2016 |
|
SAJJAD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAC
|
| 07/13/2015 |
220468615 |
01 |
A3 |
X SIGNED OFF |
04/05/2016 |
0088563 PE |
SAJJAD |
|
NOT APPLICABLE
|
|
300 SQFT POINTING BACK OF BUILDING 300 SQFT STUCC IN ROOF CHIMNEY 100
|
|
Work on Floor(s): BAC
|
| 06/10/2004 |
200862968 |
01 |
A2 |
R PERMIT-ENTIRE |
07/02/2004 |
0014250 RA |
MARKOWIT |
|
NOT APPLICABLE
|
|
MASONRY REPAIRS TO FACADE AS PER PLANS. NO CHANGE TO USE,OCCUPANCY OR
|
|
Work on Floor(s): 001 thru 006
|
| 03/25/2004 |
200845924 |
01 |
A3 |
R PERMIT-ENTIRE |
04/22/2004 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 290'DURING FACADE REPAIR.NO
|
|
Work on Floor(s): GRO
|
| 02/17/2000 |
200610892 |
01 |
A3 |
R PERMIT-ENTIRE |
02/23/2000 |
0654301 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SHED 220'DU RING FACADE REPAIR.NO CHANGE IN
|
|
Work on Floor(s): GRD
|
| 01/05/2000 |
200605737 |
01 |
A3 |
R PERMIT-ENTIRE |
01/21/2000 |
0068242 PE |
MAREK |
|
NOT APPLICABLE
|
|
REPAIR OF PARAPET WALLS , POINTING, CHIMNEY REPAIR OF COPPING STONES
|
|
Work on Floor(s): 6
|