| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/27/2018 |
220148178 |
02 |
PA |
P APPROVED |
07/12/2018 |
|
HEUBERGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 06/27/2018 |
220148169 |
04 |
PA |
P APPROVED |
07/30/2018 |
|
HEUBERGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 06/04/2015 |
220460702 |
03 |
A2 |
X SIGNED OFF |
04/14/2016 |
0066684 PE |
GOOD |
|
NOT APPLICABLE
|
|
INTERIOR TO INCLUDE SELECTIVE DEMOLITION OF EXISTING SLAB AND CONSTRUCTION
|
|
Work on Floor(s): CEL
|
| 05/29/2015 |
220460702 |
02 |
A2 |
X SIGNED OFF |
04/14/2016 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
PLUMBING WORK AS SHOWN ON PLANS FILED HERE WITH
|
|
Work on Floor(s): CEL
|
| 05/29/2015 |
220460702 |
01 |
A2 |
X SIGNED OFF |
04/14/2016 |
0020310 RA |
DOBAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO INCLUDE DEMOLITION OF EXISTING AND CONSTRUCTION OF
|
|
Work on Floor(s): CEL
|
| 02/24/2015 |
220419866 |
02 |
A2 |
P APPROVED |
02/24/2015 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 12/10/2014 |
220419866 |
01 |
A2 |
X SIGNED OFF |
04/22/2015 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
NO WORK APPLICATION FILED IN ORDER TO OBTAIN EUP CARDS FOR UNITS PREVIOUSL
|
|
Work on Floor(s): ROF
|
| 04/14/2014 |
220092094 |
16 |
A1 |
P APPROVED |
06/03/2014 |
|
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 04/01/2014 |
220100502 |
03 |
A3 |
P APPROVED |
04/15/2014 |
|
GIUDICI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/20/2013 |
220100502 |
02 |
A3 |
P APPROVED |
02/10/2014 |
|
GIUDICI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/20/2013 |
220161759 |
05 |
A2 |
P APPROVED |
01/09/2014 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,ROF
|
| 10/18/2013 |
220245866 |
02 |
A2 |
P APPROVED |
12/06/2013 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 07/10/2013 |
220324423 |
01 |
A2 |
X SIGNED OFF |
10/31/2013 |
0043167 PE |
VACHRIS |
|
NOT APPLICABLE
|
|
FILING SUPPORT OF EXCAVATION FILING FOR THE REMOVAL OF TANK AND CONTAMINAT
|
|
Work on Floor(s): OSP
|
| 07/08/2013 |
220161759 |
04 |
A2 |
P APPROVED |
10/17/2013 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,ROF
|
| 06/19/2013 |
220104438 |
10 |
A2 |
P APPROVED |
06/20/2013 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 MECHANICAL & PLUMBING AND BOILER FILED IN C
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 002
|
| 06/14/2013 |
220307825 |
01 |
A2 |
X SIGNED OFF |
01/23/2014 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
FUEL STORAGE FILED IN CONJUNCTION WITH GENERATOR FILED UNDER SEPARATE
|
|
Work on Floor(s): OSP
|
| 06/04/2013 |
220161759 |
03 |
A2 |
P APPROVED |
06/17/2013 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,ROF
|
| 05/29/2013 |
220148169 |
03 |
PA |
P APPROVED |
07/01/2013 |
|
HEUBERGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/17/2013 |
220092094 |
15 |
A1 |
P APPROVED |
06/06/2013 |
|
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 04/05/2013 |
220092094 |
14 |
A1 |
P APPROVED |
04/08/2013 |
|
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01 SEE SECTION 24.
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 03/26/2013 |
220259789 |
01 |
A2 |
X SIGNED OFF |
12/17/2013 |
0025147 PE |
HEUBERGE |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION WORK IN BASEMENT OF EXISTING BUILDING AS SHOWN ON PLAN
|
|
Work on Floor(s): BAS
|
| 01/03/2013 |
220246516 |
01 |
A2 |
X SIGNED OFF |
02/20/2014 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING WORK FILED AT CELLAR AND BASEMENT IN CONJUNCTION W
|
|
Work on Floor(s): CEL,BAS
|
| 12/27/2012 |
220092094 |
13 |
A1 |
P APPROVED |
02/13/2013 |
0025147 RA |
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01 SEE SECTION 24.
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 12/27/2012 |
220245875 |
01 |
A2 |
X SIGNED OFF |
03/06/2014 |
0082402 PE |
HIGGINS |
|
NOT APPLICABLE
|
|
SPRINKLER MODIFICATIONS AT BASEMENT LEVEL IN CONJUNCTION WITH CHANGE OF C.
|
|
Work on Floor(s): BAS
|
| 12/27/2012 |
220245866 |
01 |
A2 |
X SIGNED OFF |
02/24/2014 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO EXISTING SYSTEM
|
|
Work on Floor(s): BAS
|
| 11/29/2012 |
220092094 |
12 |
A1 |
P APPROVED |
12/11/2012 |
0025147 RA |
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 10/19/2012 |
220092094 |
11 |
A1 |
P APPROVED |
11/13/2012 |
0067018 PE |
TORTOREL |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 10/10/2012 |
220104438 |
09 |
A2 |
P APPROVED |
10/11/2012 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 002
|
| 09/28/2012 |
220092094 |
10 |
A1 |
G PAA FEE DUE |
09/28/2012 |
0067018 PE |
TORTOREL |
|
AMENDED 04/29/2011
|
|
DOC WITHDRAWN 10/12/2012
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 09/15/2012 |
220104438 |
08 |
A2 |
P APPROVED |
09/24/2012 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 002
|
| 09/14/2012 |
220161759 |
02 |
A2 |
P APPROVED |
09/27/2012 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,ROF
|
| 08/30/2012 |
220148169 |
02 |
PA |
P APPROVED |
08/31/2012 |
|
HEUBERGE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/30/2012 |
220092094 |
09 |
A1 |
P APPROVED |
09/07/2012 |
|
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 08/14/2012 |
220104438 |
07 |
A2 |
P APPROVED |
08/16/2012 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 002
|
| 08/01/2012 |
220104438 |
06 |
A2 |
P APPROVED |
08/14/2012 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 002
|
| 07/16/2012 |
220197588 |
01 |
A2 |
P APPROVED |
07/16/2012 |
0059739 PE |
SIDDIQUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/24/2012 TO FILE APPLICATION FOR PARTIAL DEMOLITION OF ROO
|
|
Work on Floor(s): ROO
|
| 07/11/2012 |
220160796 |
02 |
A2 |
P APPROVED |
08/16/2012 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 SEE SECTION 24
|
|
Work on Floor(s): CEL,002,003,ROF
|
| 06/26/2012 |
220092094 |
08 |
A1 |
P APPROVED |
07/03/2012 |
|
HEUBERGE |
|
AMENDED 04/29/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
| 06/20/2012 |
220104438 |
05 |
A2 |
P APPROVED |
06/25/2012 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 002
|
| 05/15/2012 |
220202180 |
01 |
A3 |
X SIGNED OFF |
08/27/2012 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|