 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/11/2015 |
220454121 |
01 |
A2 |
X SIGNED OFF |
01/11/2018 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL NEW GAS SERVICE, METER AND PIPING AND ACTIVATE GAS PORTION OF EXIS
|
|
Work on Floor(s): CEL,OSP
|
| 07/09/2007 |
210003761 |
01 |
A3 |
J P/E DISAPPROVED |
07/16/2007 |
0075376 PE |
SCHERER |
|
NOT APPLICABLE
|
|
INSTALLING A TELECOMMUNICATIONS SHELTERWITH HVAC, RELATED DUNNAGE AND
|
|
Work on Floor(s): ROF
|
| 11/02/1990 |
200084666 |
01 |
A2 |
R PERMIT-ENTIRE |
03/26/1992 |
0040279 PE |
FLYNN |
|
NOT APPLICABLE
|
|
INSTALLATION OF (1) FEDERAL BOILER AND ( 1) INDUSTRIAL COMBUSTION FUEL B
|
|
Work on Floor(s): BAS
|