 |  |  |  |  |  |  |  |  |  |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
06/25/2019 |
240256897 |
01 |
A2 |
R PERMIT-ENTIRE |
09/09/2019 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REFILING OF DOB JOB NO. 240027341 FOR THE REPLACEMENT OF OIL BURNER WITH G
|
|
Work on Floor(s): CEL
|
10/19/2015 |
240118797 |
01 |
A3 |
R PERMIT-ENTIRE |
10/21/2015 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
SPOT POINTING & WINDOW LINTELS REPLACEMENT AS PER PLAN .NO CHANGE IN US
|
|
Work on Floor(s): 001 thru 006
|
10/01/2015 |
240116575 |
01 |
A3 |
X SIGNED OFF |
05/10/2016 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
06/11/2013 |
240027341 |
01 |
A2 |
R PERMIT-ENTIRE |
08/30/2017 |
0019437 RA |
BADALY |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW GAS PIPING TO SUPPLY REPLACED DUAL BURNER AND INSTALL
|
|
Work on Floor(s): CEL,OSP
|
05/13/2013 |
240025708 |
01 |
A2 |
H P/E IN PROCESS |
05/13/2013 |
0019437 RA |
BADALY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/27/2013 INSTALLATION OF NEW GAS PIPING TO SUPPLY EXISTING
|
|
Work on Floor(s): CEL,OSP
|
02/28/2011 |
220104081 |
02 |
A3 |
P APPROVED |
03/01/2011 |
|
STILES |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
02/09/2011 |
220104081 |
01 |
A3 |
R PERMIT-ENTIRE |
02/10/2011 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
FACADE REPAIR AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER TH
|
|
Work on Floor(s): OSP
|
02/09/2011 |
220104072 |
01 |
A3 |
R PERMIT-ENTIRE |
03/22/2011 |
0033652 RA |
STILES |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVYDUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|