![]() |
|
|
| NYC Department of Buildings | ||
| Job Overview | ||
|
|||||
| ARA / LAA Job Overview |
| Page: 1 of 1 | ||
| Premises: 217 BEDFORD PARK BOULEVARD BRONX | BIN: 2017212 Block: 3306 Lot: 52 | |
| FILE DATE | JOB # | JOB TYPE | JOB STATUS | STATUS DATE | LIC # | APPLICANT | ||
| 06/19/2008 | 201019076 | PR | E LAA FILED | 06/19/2008 | MP 001642 | SANZ JR | ||
| REMOVE 1 EXIST.BOILER, & REPLACE W/2 NEW BOILERS2 WH.NEW WATERS ARE AO SMI | ||||||||
|
Work on Floor(s): CEL | ||||||||
| 10/30/2003 | 200579258 | PR | I LAA SIGNED OFF | 11/14/2003 | MP 001642 | SANZ JR | ||
| REMOVING BATHROOM ON THE 3RD FLOOR. | ||||||||
|
Work on Floor(s): 003 | ||||||||