FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
02/27/2018 |
220635864 |
01 |
A2 |
R PERMIT-ENTIRE |
03/19/2018 |
0087243 PE |
WONG |
|
NOT APPLICABLE
|
|
REPAIR DAMAGED STAIRCASE FROM 5TH FLOOR TO ROOF. RESOLVE ECB VIOLATION 352
|
|
Work on Floor(s): 005,ROF
|
05/27/2015 |
220460016 |
01 |
A2 |
R PERMIT-ENTIRE |
06/10/2015 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
INSTALLING FIRE SUPPRESSION SYSTEM ONLY. THERE WILL BE NO CHANGE IN USE E
|
|
Work on Floor(s): 001
|
06/03/2011 |
220121856 |
01 |
A2 |
Q PERMIT-PARTIAL |
06/20/2011 |
0013529 RA |
KATZ |
|
NOT APPLICABLE
|
|
MODIFY PREVIOUSLY FILED FIRE SUPPRESSION SYSTEM FILED UNDER APPLICATION
|
|
Work on Floor(s): 1ST
|
03/30/2005 |
200940713 |
01 |
A3 |
X SIGNED OFF |
08/03/2009 |
|
SINGH |
|
NOT APPLICABLE
|
|
CONSTRUCTION OF 100 1.F HEAVY DUTY SIDEWALK SHED WITH NO STORAGE
|
|
Work on Floor(s): GRO
|
03/08/2005 |
200936657 |
01 |
A2 |
X SIGNED OFF |
06/16/2009 |
0020520 RA |
MCNEILL |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO REBUILD AND REPLACE 151 LINEAR FEET OF PARAPHET WALL.
|
|
Work on Floor(s): 001 thru 005
|
10/27/1998 |
200529302 |
01 |
A2 |
R PERMIT-ENTIRE |
11/09/1998 |
0056795 PE |
VARGAS |
|
NOT APPLICABLE
|
|
INSTALLATION OF COOKING EQUIPMENT VENTIL ATION SYSTEM PARTITION. NO CHAN
|
|
Work on Floor(s): 1ST
|
10/27/1998 |
200529286 |
01 |
A2 |
R PERMIT-ENTIRE |
11/18/1998 |
0556795 PE |
VARGAS |
|
NOT APPLICABLE
|
|
INSTALLATION FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE OR OCCUPANCY UNDE
|
|
Work on Floor(s): 1ST
|