| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
08/11/2011 |
220135146 |
01 |
A2 |
X SIGNED OFF |
05/15/2013 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE OIL FIRED BOILER WITH GAS HEATING BOILER AND GAS HOT WATER BOILER
|
|
Work on Floor(s): CEL
|
09/08/2010 |
220076593 |
02 |
A3 |
P APPROVED |
09/08/2010 |
|
PARIHAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
08/10/2010 |
220076593 |
01 |
A3 |
X SIGNED OFF |
10/06/2011 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
06/18/2010 |
220068423 |
01 |
A3 |
R PERMIT-ENTIRE |
06/24/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|