| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/30/2016 |
220327199 |
06 |
A2 |
P APPROVED |
01/31/2017 |
0021720 RA |
GEORGES, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REPLACEMENT OF ROOF MEMBRANE, WINDOW SILL R
|
|
Work on Floor(s): BAS 001 thru 004
|
| 07/06/2016 |
220327199 |
05 |
A2 |
P APPROVED |
10/13/2016 |
|
GEORGES, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 004
|
| 09/11/2014 |
220327199 |
04 |
A2 |
P APPROVED |
09/12/2014 |
|
GEORGES, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 004
|
| 07/03/2014 |
220327199 |
03 |
A2 |
P APPROVED |
07/15/2014 |
|
GEORGES, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 004
|
| 03/12/2014 |
220327199 |
02 |
A2 |
P APPROVED |
05/06/2014 |
|
GEORGES, |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 004
|
| 08/23/2013 |
220327199 |
01 |
A2 |
X SIGNED OFF |
02/14/2017 |
0021720 RA |
GEORGES, |
|
NOT APPLICABLE
|
|
REPLACEMENT OF ROOF MEMBRANE, WINDOW SILL RAKE & PAINT MASONRY AT STREET F
|
|
Work on Floor(s): BAS 001 thru 004
|
| 07/09/2013 |
240030024 |
01 |
A3 |
X SIGNED OFF |
06/25/2014 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 11/14/2007 |
210022606 |
01 |
A2 |
R PERMIT-ENTIRE |
11/20/2007 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER # MD 33510-01). NO CHANGE IN EG
|
|
Work on Floor(s): BAS
|
| 07/18/2001 |
200680833 |
01 |
A3 |
R PERMIT-ENTIRE |
10/22/2001 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SH ED 50'DURING FACADE REPAIR.DURI
|
|
Work on Floor(s): GRD
|