| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/10/2018 |
240221826 |
02 |
A2 |
P APPROVED |
11/23/2018 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF
|
| 05/09/2018 |
240221826 |
01 |
A2 |
X SIGNED OFF |
02/21/2019 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND GAS/OIL BURNER. INSTALL NEW CHIMNEY LINER AS PER PLANS.
|
|
Work on Floor(s): CEL,ROF
|
| 11/22/2011 |
220123738 |
02 |
A3 |
P APPROVED |
03/19/2012 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/10/2011 |
220123738 |
01 |
A3 |
X SIGNED OFF |
03/27/2012 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 05/25/2011 |
220120651 |
01 |
A3 |
X SIGNED OFF |
04/06/2012 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|