| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/22/2018 |
220600428 |
02 |
A3 |
P APPROVED |
03/29/2018 |
|
ALI MAHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/25/2017 |
220600428 |
01 |
A3 |
R PERMIT-ENTIRE |
08/13/2018 |
0095097 PE |
ALI MAHE |
|
NOT APPLICABLE
|
|
CONSTRUCT NEW CONCRETE RETAINING WALL AS SHOWN ON PLANS.
|
|
Work on Floor(s): OSP
|
| 03/01/2017 |
240172852 |
02 |
A3 |
P APPROVED |
03/01/2017 |
|
AHMED |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 02/10/2017 |
240172852 |
01 |
A3 |
X SIGNED OFF |
03/01/2018 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 11/07/2016 |
220552220 |
01 |
DM |
X SIGNED OFF |
05/09/2017 |
OT |
ZERVOUDI |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF 2 1/2 STORY, USING HAND HELD EQUIPMENT AND MACHINE TO R
|
|
Work on Floor(s): BSM,ATT 001 thru 002
|
| 03/17/1997 |
200415531 |
01 |
A1 |
X SIGNED OFF |
09/11/1997 |
0054580 PE |
RUFFALO |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO LEGALIZE CONSTRUCTI ON AT BASEMENT FLOOR,TO LEGALI
|
|
Work on Floor(s): BAS,1, 2, ATT
|