| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/02/2008 |
210017701 |
02 |
A2 |
P APPROVED |
10/15/2008 |
|
Samiljan |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 007
|
| 10/10/2007 |
210017701 |
01 |
A2 |
X SIGNED OFF |
02/09/2009 |
0083041 PE |
Samiljan |
|
NOT APPLICABLE
|
|
Exterior facade and roof level repairs. NO CHANGE IN USE, EGRESS OR OCCUPA
|
|
Work on Floor(s): ROF 001 thru 007
|
| 07/25/2007 |
210007053 |
01 |
A3 |
R PERMIT-ENTIRE |
07/31/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 50 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 09/11/2003 |
200682252 |
02 |
A2 |
P APPROVED |
09/24/2003 |
0017342 RA |
ELY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/14/2001 |
200682261 |
01 |
A1 |
X SIGNED OFF |
05/13/2005 |
0017342 PE |
ELY |
|
NOT APPLICABLE
|
|
PROPOSED DAY CARE CENTER IN EXISTING DEN TIST OFFICE AT GRADE LEVEL.
|
|
Work on Floor(s): CEL
|
| 08/06/2001 |
200682252 |
01 |
A2 |
X SIGNED OFF |
03/18/2004 |
0017342 RA |
ELY |
|
NOT APPLICABLE
|
|
ALTERATION TO PARTITION AND PLUMBING LAY OUT IN CELLAR.NO CHANGE TO USE,
|
|
Work on Floor(s): CEL
|
| 04/28/2000 |
200620382 |
01 |
A2 |
X SIGNED OFF |
08/25/2000 |
0076825 PE |
CHRYSLER |
|
NOT APPLICABLE
|
|
EPLACE OIL BURNER CHANGE GRADE OF OIL FROM 4 TO 2
|
|
Work on Floor(s): CEL
|
| 11/04/1996 |
200387429 |
01 |
A2 |
R PERMIT-ENTIRE |
11/15/1996 |
0047135 PE |
GERMAIN, |
|
NOT APPLICABLE
|
|
CHANGE GRADE OF FUEL OIL FROM #6 OIL TO #4 OIL.NO CHANGE IN MEANS OF
|
|
Work on Floor(s): BAS
|
| 11/22/1991 |
200168834 |
01 |
A3 |
X SIGNED OFF |
03/04/1992 |
0013091 RA |
GIBSON |
|
NOT APPLICABLE
|
|
CHANGE LAYOUT OF APTS. 6E & 7E. INSTALL NEW INTERIOR STAIR 6TH TO 7TH
|
|
Work on Floor(s): 6, 7
|
| 09/07/1990 |
200078897 |
01 |
A2 |
X SIGNED OFF |
04/11/1991 |
0013091 RA |
GIBSON |
|
NOT APPLICABLE
|
|
INSTALL NEW PARTITIONS, CONSTRUCT NEW S- TAIR FROM 2ND TO 3RD FLOOR IN A
|
|
Work on Floor(s): 2ND,3RD
|