 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/04/2014 |
220192128 |
05 |
A3 |
P APPROVED |
08/04/2014 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/04/2014 |
220282584 |
04 |
A3 |
P APPROVED |
08/04/2014 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 06/03/2014 |
220192128 |
04 |
A3 |
P APPROVED |
06/03/2014 |
0083278 RA |
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/03/2014 |
220282584 |
03 |
A3 |
P APPROVED |
06/03/2014 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 11/13/2013 |
220192128 |
03 |
A3 |
P APPROVED |
11/13/2013 |
|
OKTAWIEC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/13/2013 |
220282584 |
02 |
A3 |
P APPROVED |
11/14/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
| 06/28/2013 |
220322274 |
01 |
A3 |
X SIGNED OFF |
10/10/2013 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
PROPOSED TO REPLACE EXISTING CORRIDOR SLAB IN BUILDING #6 FROM 2ND TO 6TH
|
|
Work on Floor(s): 002 thru 006
|
| 04/03/2013 |
220282584 |
01 |
A3 |
R PERMIT-ENTIRE |
09/17/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH
|
| 04/03/2013 |
220192128 |
02 |
A3 |
P APPROVED |
04/03/2013 |
|
OKTAWIEC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 80 LINEAR FEET OF HEAVY DUT
|
|
Work on Floor(s): OSP
|
| 06/19/2012 |
220192128 |
01 |
A3 |
R PERMIT-ENTIRE |
11/18/2014 |
0083278 RA |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 80 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL RE
|
|
Work on Floor(s): OSP
|
| 04/20/2012 |
220140489 |
01 |
A2 |
X SIGNED OFF |
05/20/2015 |
0014327 RA |
ZIMMERMA |
|
NOT APPLICABLE
|
|
THE EXISTING PARAPETS SHALL BE REMOVED IN SELECT LOCATIONS AND REPLACED WI
|
|
Work on Floor(s): ROF
|
| 12/10/2010 |
220096697 |
01 |
A2 |
R PERMIT-ENTIRE |
01/11/2011 |
0080474 PE |
BERMAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF AN, AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALAR
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 09/14/2010 |
220018736 |
02 |
A2 |
P APPROVED |
09/14/2010 |
|
SCHIMENT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF 001 thru 006
|
| 08/04/2009 |
220021330 |
01 |
A3 |
X SIGNED OFF |
05/02/2011 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 926 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR FACADE REP
|
|
Work on Floor(s): OSP
|
| 07/16/2009 |
220018736 |
01 |
A2 |
X SIGNED OFF |
11/04/2010 |
0015046 RA |
SCHIMENT |
|
NOT APPLICABLE
|
|
FACADE REPAIR INCLUDING: MASONRY POINTING, LINTEL REPAIR, PARAPET REPAIR,
|
|
Work on Floor(s): ROF 001 thru 006
|
| 10/17/2006 |
201083175 |
01 |
A2 |
X SIGNED OFF |
03/18/2008 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE FOUR (4) HYDROTHERM GAS BOILERS WITH (2) FEDERAL FST-175 BOILERS W
|
|
Work on Floor(s): CEL
|
| 11/04/2005 |
201008284 |
01 |
A2 |
X SIGNED OFF |
01/26/2007 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
INSTALL COGEN CM75 EMERGENCY GENERATORIN CELLAR. NO CHANGE IN USE,
|
|
Work on Floor(s): CEL
|
| 06/15/1992 |
200211724 |
01 |
A3 |
P APPROVED |
06/24/1992 |
0181381 RA |
CUTSOGEO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TELEPHONE EQUIPMENT AS PER PLAN. NO CHANGE IN USE, EGRE
|
|
Work on Floor(s): CEL
|