 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/02/2019 |
240257850 |
01 |
A3 |
H P/E IN PROCESS |
07/02/2019 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 08/31/2019 FACADE REPAIR, BRICK REPLACEMENT AND POINTING AS P
|
|
Work on Floor(s): 001 thru 005
|
| 02/08/2019 |
240248399 |
01 |
A3 |
H P/E IN PROCESS |
02/08/2019 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 04/09/2019 FACADE REPAIR, BRICK REPLACEMENT AND POINTING AS P
|
|
Work on Floor(s): 001 thru 005
|
| 11/15/2018 |
240243018 |
01 |
A3 |
H P/E IN PROCESS |
11/15/2018 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 01/14/2019 FACADE REPAIR, BRICK REPLACEMENT AND POINTING AS P
|
|
Work on Floor(s): 001 thru 005
|
| 11/24/1992 |
200229412 |
01 |
A2 |
X SIGNED OFF |
02/01/1993 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER AND CHANGE GRADE OF OIL FROM #4 TO #2.
|
|
Work on Floor(s): CEL
|