| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
03/18/2009 |
210080204 |
02 |
A2 |
G PAA FEE DUE |
03/18/2009 |
|
PEROTTO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 09/04/2009
|
|
Work on Floor(s): CEL
|
11/21/2008 |
210080204 |
01 |
A2 |
R PERMIT-ENTIRE |
01/13/2009 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE BOIL AND BURNER, CHANGE FUEL FROM #4 TO 6 OIL NO CHANGE IN USE,
|
|
Work on Floor(s): CEL
|
11/22/2000 |
200646989 |
01 |
A2 |
X SIGNED OFF |
05/23/2001 |
0022659 RA |
DEVIVO |
|
NOT APPLICABLE
|
|
REPAIR OF EXISTING PARAPET WALLS A S PER PLAN & REMOVAL OF VIOLATI
|
|
Work on Floor(s): PAR
|
10/13/2000 |
200642082 |
01 |
A3 |
R PERMIT-ENTIRE |
10/18/2000 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 322'HEAVY DUTY SIDEWALK BRIDGE DURING FACADE REPAIR.NO C
|
|
Work on Floor(s): GRD
|