| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/20/2019 |
240227848 |
02 |
A3 |
P APPROVED |
02/25/2019 |
|
O'CONNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 12/07/2018 |
240220701 |
02 |
A3 |
P APPROVED |
02/07/2019 |
|
O'CONNOR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004 thru 006
|
| 07/03/2018 |
240227848 |
01 |
A3 |
X SIGNED OFF |
04/08/2019 |
0035839 RA |
O'CONNER |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF CHUTTER AS PER PLANS. NO CHANGE IN USE OCCUPANCY
|
|
Work on Floor(s): OSP
|
| 04/27/2018 |
240220701 |
01 |
A3 |
X SIGNED OFF |
02/21/2019 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
POINTING, PARAPET WALL REPLACEMENT & BRICK REPLACEMENT AS PER PLAN .NO C
|
|
Work on Floor(s): 004 thru 006
|
| 10/11/2017 |
240202106 |
01 |
A3 |
X SIGNED OFF |
12/06/2017 |
0049434 PE |
SUBEN |
|
NOT APPLICABLE
|
|
PROPOSED EXTERIOR FACADE REPAIR WORK AS PER PLANS. NO CHANGE IN USE EGRESS
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 10/05/2015 |
240116806 |
01 |
A2 |
R PERMIT-ENTIRE |
10/06/2015 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO
|
|
Work on Floor(s): CEL
|
| 09/11/2013 |
220334608 |
01 |
A2 |
P APPROVED |
09/11/2013 |
0015633 RA |
FEOKTIST |
|
NOT APPLICABLE
|
|
BRACING OF ROOF PARAPET NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS
|
|
Work on Floor(s): EXT,ROF
|
| 01/03/2012 |
220162614 |
01 |
A3 |
R PERMIT-ENTIRE |
05/14/2013 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 10/26/2011 |
220147008 |
01 |
A2 |
R PERMIT-ENTIRE |
10/26/2011 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/17/2012 REPLACE OIL BURNER ON NYC BOILER # MD7660-01 WITH
|
|
Work on Floor(s): BAS
|
| 02/03/2011 |
220066158 |
02 |
A2 |
P APPROVED |
02/22/2011 |
|
ESHKAR- |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 005
|
| 06/07/2010 |
220066158 |
01 |
A2 |
X SIGNED OFF |
03/01/2011 |
0018190 RA |
ESHKAR- |
|
NOT APPLICABLE
|
|
GAS REPIPE FROM METER BARS TO STOVES IN 45 APTS AND ONE BOILER PILOT
|
|
Work on Floor(s): BAS 001 thru 005
|
| 05/06/2005 |
200970075 |
01 |
A3 |
P APPROVED |
05/13/2005 |
|
HAROON |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SHED 200LF LONG AT 27 -29 WEST 181 ST DURING REMEDIAL
|
|
Work on Floor(s): OSP
|
| 07/24/1995 |
200341978 |
01 |
A2 |
R PERMIT-ENTIRE |
08/14/1995 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER & OIL BURNER. CHANGE - GRADE OF FUEL OIL FROM 4 TO 2.
|
|
Work on Floor(s): CEL
|
| 03/25/1991 |
200107231 |
01 |
A2 |
R PERMIT-ENTIRE |
04/19/1991 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER AND CHANGE FUEL TO #2 OIL
|
|
Work on Floor(s): CEL
|