![]() |
|
|
| NYC Department of Buildings | ||
| Job Overview | ||
|
|||||
| Page: 1 of 1 | ||
| Premises: 2175 MORRIS AVENUE BRONX | BIN: 2013987 Block: 3181 Lot: 45 | |
| FILE DATE | JOB # | DOC # | JOB TYPE | JOB STATUS | STATUS DATE | LIC # | APPLICANT | IN AUDIT | ZONING APPROVAL | |
| 01/10/2006 | 200908036 | 01 | A2 | X SIGNED OFF | 04/12/2006 | 0018190 RA | ESHKAR | NOT APPLICABLE | ||
| REPLACE EXISTING GAS REPIPE THROUGOUTBUILDING FROM METER BARSIN CELLA | ||||||||||
|
Work on Floor(s): CEL 001 thru 005 | ||||||||||
| 09/15/2005 | 200996958 | 01 | A3 | X SIGNED OFF | 02/01/2006 | 0057146 PE | ROBBEN | NOT APPLICABLE | ||
| INSTALLING TELECOMM. SHELTER WITHHVAC & RELATED DUNNAGE ON ROOF | ||||||||||
|
Work on Floor(s): ROF | ||||||||||