FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
09/25/2024 |
201192271 |
05 |
A2 |
P APPROVED |
09/25/2024 |
|
DESROCHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): PH
|
08/15/2024 |
201193109 |
02 |
A2 |
P APPROVED |
08/15/2024 |
|
EID |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF 001 thru 003
|
12/28/2021 |
201192271 |
04 |
A2 |
P APPROVED |
12/28/2021 |
|
DESROCHE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): PH
|
12/03/2018 |
201198809 |
01 |
A2 |
R PERMIT-ENTIRE |
04/10/2024 |
0073979 PE |
EID |
|
NOT APPLICABLE
|
|
ROOM CONVERSION FROM OFFICE RM#300 TO SCIENCE RESOURCE PREP RM AND CLASSRO
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
11/02/2016 |
201197052 |
01 |
A3 |
X SIGNED OFF |
12/06/2019 |
0069932 PE |
CUNNINGH |
|
NOT APPLICABLE
|
|
FILING APPLICATION TO INSTALL 71 LF OF 8'H CONSTR FENCE (CHAIN LINK WITH F
|
|
Work on Floor(s): OSP
|
10/26/2016 |
201197025 |
01 |
A3 |
X SIGNED OFF |
12/06/2019 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
SF/PS246X - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEM
|
|
Work on Floor(s): OSP
|
10/21/2016 |
201197007 |
01 |
A3 |
X SIGNED OFF |
10/29/2020 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
SH/PS246X - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEM
|
|
Work on Floor(s): OSP
|
11/07/2014 |
201193109 |
01 |
A2 |
R PERMIT-ENTIRE |
08/12/2024 |
0073979 PE |
EID |
|
NOT APPLICABLE
|
|
REMOVE/REPLACE: PARAPETS, ROOF'G, ROOF DRAINS, STAIR BLKHD DRS/FRAMES/HARD
|
|
Work on Floor(s): BAS,ROF 001 thru 003
|
09/18/2014 |
201192752 |
01 |
A2 |
R PERMIT-ENTIRE |
11/14/2014 |
0065346 PE |
DESROCHE |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING FIRE ALARM SYSTEM. ADDITIONAL DEVICES.
|
|
Work on Floor(s): 003,ROF
|
07/10/2014 |
201192271 |
03 |
A2 |
R PERMIT-ENTIRE |
07/13/2017 |
0065346 PE |
DESROCHE |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW SPLIT AIR AC UNIT AND THE REMOVAL OF 1 SPRINKLER HEAD.
|
|
Work on Floor(s): PH
|
07/10/2014 |
201192271 |
02 |
A2 |
R PERMIT-ENTIRE |
02/17/2017 |
0063672 PE |
BACAS |
|
NOT APPLICABLE
|
|
REPLACEMENT OF ELEVATOR SHEAVE BEAMS & ROOF BULKHEADS.
|
|
Work on Floor(s): SUB,BAS,ROF 001 thru 003
|
07/10/2014 |
201192271 |
01 |
A2 |
R PERMIT-ENTIRE |
01/10/2022 |
0022611 RA |
PURCELL |
|
NOT APPLICABLE
|
|
REPLACEMENT OF EXISTING ELEVATOR/STAIR 'B' BULKHEAD; REMOVAL OF OLD DUMBWA
|
|
Work on Floor(s): BAS,PH 001 thru 003
|
05/06/2013 |
201015695 |
08 |
A2 |
P APPROVED |
05/06/2013 |
0066638 PE |
CHEN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL
|
04/10/2013 |
201029519 |
01 |
A3 |
X SIGNED OFF |
07/27/2020 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS246X/FN SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPO
|
|
Work on Floor(s): OSP
|
04/08/2013 |
201015695 |
07 |
A2 |
P APPROVED |
04/08/2013 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS
|
03/26/2013 |
201029387 |
01 |
A3 |
X SIGNED OFF |
10/01/2020 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS246X/SH SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPO
|
|
Work on Floor(s): OSP
|
07/30/2010 |
201023025 |
02 |
A2 |
J P/E DISAPPROVED |
07/30/2010 |
|
BAJRAMOS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
09/18/2009 |
201015695 |
06 |
A2 |
P APPROVED |
09/18/2009 |
|
KRISHNAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
09/12/2009 |
201015695 |
05 |
A2 |
P APPROVED |
09/12/2009 |
|
KRISHNAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
05/28/2009 |
201017185 |
03 |
A2 |
P APPROVED |
05/28/2009 |
|
LAM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BSM,3RD
|
10/09/2008 |
201019496 |
01 |
A3 |
X SIGNED OFF |
04/19/2010 |
0076016 PE |
THIMMAPA |
|
NOT APPLICABLE
|
|
PS246 PIPE SCAFFOLDING IN CONJUNCTION W/ONGOING REPAIRS
|
|
Work on Floor(s): OSP
|
09/19/2008 |
201019352 |
01 |
A2 |
X SIGNED OFF |
08/22/2013 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
P.S.246; INSTALL TEMPORARY METAL CHIMNEY & OUTDOOR FUEL OIL TANK DURING
|
|
Work on Floor(s): OSP
|
09/03/2008 |
201019209 |
01 |
A3 |
X SIGNED OFF |
06/08/2010 |
0011024 PE |
THIMMAPP |
|
NOT APPLICABLE
|
|
PS246 FENCE @ ONGOING SCHOOL REPAIR JOB
|
|
Work on Floor(s): OSP
|
09/03/2008 |
201019183 |
01 |
A3 |
X SIGNED OFF |
04/19/2010 |
0076016 PE |
THIMMAPP |
|
NOT APPLICABLE
|
|
PS246 SIDEWALKSHED @ ONGOING REPAIR SCHOOL JOB
|
|
Work on Floor(s): OSP
|
07/19/2008 |
201017185 |
02 |
A2 |
X SIGNED OFF |
06/01/2009 |
0046632 PE |
CHU |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE EXISTING WALK-IN FREEZER EVAPORATORS AND CONDENSERS INC
|
|
Work on Floor(s): BSM,CEL,3RD
|
07/19/2008 |
201017185 |
01 |
A2 |
X SIGNED OFF |
06/01/2009 |
0019599 RA |
LAM |
|
NOT APPLICABLE
|
|
REPAIR PLASTER WALLS. REPAIR AND PAINT CONCRETE FLOOR. PATCH AND REPAIR PL
|
|
Work on Floor(s): CEL,BSM,3RD
|
06/26/2008 |
201017130 |
01 |
A3 |
X SIGNED OFF |
06/11/2010 |
0082098 PE |
ABOUZID |
|
NOT APPLICABLE
|
|
PS246 INSTALLATION OF 330 LF OF CONSTRUCTION FENCE AT BUILDING # 2641 GRAN
|
|
Work on Floor(s): OSP
|
05/01/2008 |
201015695 |
04 |
A2 |
X SIGNED OFF |
08/22/2013 |
0066638 PE |
CHEN |
|
NOT APPLICABLE
|
|
P.S. 246 - X ; INSTALL NEW REINFORCED CONCRETE EQUIPMENT PADS,INSTALL NEW
|
|
Work on Floor(s): CEL
|
05/01/2008 |
201015695 |
03 |
A2 |
X SIGNED OFF |
08/22/2013 |
0022384 RA |
TEPLITSK |
|
NOT APPLICABLE
|
|
P.S.246 - X : REMOVE & RE-INSTALL FENCE,WALL,DOORS,WINDOWS FOR EQUIPMENT A
|
|
Work on Floor(s): CEL
|
05/01/2008 |
201015695 |
02 |
A2 |
X SIGNED OFF |
08/22/2013 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
P.S.246 - X :CAP EXISTING GAS SERVICE & INSTALL NEW 8"LOW GAS PRESSURE SER
|
|
Work on Floor(s): CEL,BAS
|
05/01/2008 |
201015695 |
01 |
A2 |
X SIGNED OFF |
08/22/2013 |
0057935 PE |
KRISHNAN |
|
NOT APPLICABLE
|
|
P.S. 246 - X : REMOVE EXISTING (2)OIL TANKS,FUEL OIL FILL BOX,FUEL OIL TRA
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
04/15/2008 |
200834446 |
02 |
PA |
P APPROVED |
04/15/2008 |
|
MOZUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,002
|
04/15/2008 |
200547578 |
02 |
PA |
P APPROVED |
04/15/2008 |
|
MOZUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
02/13/2008 |
201023025 |
01 |
A2 |
R PERMIT-ENTIRE |
04/28/2008 |
0072463 PE |
BAJRAMOS |
|
NOT APPLICABLE
|
|
PS246 REPLACE FA W/NEW MASTER CODED INDIVIDUALLY ADDRESSABLE INTERIOR FA
|
|
Work on Floor(s): CEL,BAS 001 thru 003
|
01/18/2008 |
201022703 |
01 |
A2 |
X SIGNED OFF |
02/02/2011 |
0001195 RA |
DUDA |
|
NOT APPLICABLE
|
|
PS246 REPLACE PAVEMENT, REPAIR STEEL PICKET FENCE, SCRAPE & PAINT, REPLA
|
|
Work on Floor(s): OSP
|
12/09/2005 |
200571078 |
02 |
A2 |
G PAA FEE DUE |
12/09/2005 |
0031331 PE |
MOZUR |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/22/2007
|
|
Work on Floor(s): ENT,IRE
|
12/09/2005 |
200571078 |
01 |
A2 |
R PERMIT-ENTIRE |
12/09/2005 |
0031331 PE |
MOZUR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/22/2007 PS246 SMOKE DETECTION SYSTEM INSTALLATION FOR ELE
|
|
Work on Floor(s): ENT,IRE
|
07/09/2004 |
200834446 |
01 |
PA |
U COMPLETED |
12/07/2009 |
0031331 PE |
MOZUR |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001,002
|
12/15/2003 |
200820530 |
01 |
A2 |
Q PERMIT-PARTIAL |
01/07/2004 |
0015966 RA |
MCKNOWN |
|
NOT APPLICABLE
|
|
DEMLOISHED AND CONSTRUCT INTERIOR PARTTITIONS, SUSPENDED CEILINGS
|
|
Work on Floor(s): BAS
|
05/30/2002 |
200547578 |
01 |
PA |
U COMPLETED |
12/07/2009 |
0031331 PE |
MOZUR |
|
NOT APPLICABLE
|
|
Work on Floor(s): BAS
|