 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/12/2019 |
240233109 |
02 |
A3 |
P APPROVED |
05/10/2019 |
|
HAIDER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 005
|
| 08/17/2018 |
240233109 |
01 |
A3 |
R PERMIT-ENTIRE |
08/20/2018 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
FACADE REPAIR, BRICK REPLACEMENT, CRACK REPAIR, AND POINTING AS PER PLAN.
|
|
Work on Floor(s): 001 thru 005
|
| 08/20/2004 |
200876249 |
01 |
A3 |
X SIGNED OFF |
09/21/2004 |
0065657 PE |
Chan |
|
NOT APPLICABLE
|
|
REPLACEMENT OF SECOND FLOOR WOOD JOISTS IN APT #2B AND CEILING WITH NEW PA
|
|
Work on Floor(s): 001,002
|