 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/01/2019 |
240257832 |
01 |
A2 |
X SIGNED OFF |
09/13/2019 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): CEL
|
| 08/08/2012 |
220198854 |
01 |
A3 |
X SIGNED OFF |
05/08/2013 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
MINOR EXTERIOR REPAIRS INCLUDING, RE-POINTING, WATERPROOFING AND BRICK
|
|
Work on Floor(s): 001 thru 006
|
| 09/13/1996 |
200381229 |
01 |
A2 |
X SIGNED OFF |
11/07/1997 |
0014920 RA |
DIAS |
|
NOT APPLICABLE
|
|
UNDERPINNING OF THE CONCRETE WALL AND CO NCRETE PIER.
|
|
Work on Floor(s): 001 thru 006
|
| 12/21/1994 |
200301468 |
01 |
A1 |
X SIGNED OFF |
01/25/1999 |
0014920 RA |
DIAS |
|
NOT APPLICABLE
|
|
CHANGE OFFICE TO APT. ON 1ST. FL. DUPLEX 5 & 6 FLS. TO SINGLE APTS. RE
|
|
Work on Floor(s): CEL 1 thru 6
|
| 03/28/1994 |
200286332 |
01 |
A2 |
X SIGNED OFF |
10/16/1998 |
0059826 PE |
DIAS |
|
NOT APPLICABLE
|
|
AS SHOWN ON PLANS, NEW STEEL CHANNELS & ANGLES AT EXTERIOR & INTERIOR
|
|
Work on Floor(s): 1 thru 6
|