 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/25/2017 |
220584188 |
02 |
A2 |
P APPROVED |
05/25/2017 |
|
KWAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 02/21/2017 |
220584188 |
01 |
A2 |
X SIGNED OFF |
12/12/2017 |
0095159 PE |
KWAN |
|
NOT APPLICABLE
|
|
PROPOSED NEW LAUNDRY ROOM IN BASEMENT OF AN EXIST'G 5 STORY BRICK BUILDING
|
|
Work on Floor(s): BAS
|
| 05/26/2016 |
220530753 |
01 |
A2 |
X SIGNED OFF |
04/10/2017 |
0026846 RA |
SHIN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APT 5C. REMOVE AND INSTALL NON BEARING PARTITIONS A
|
|
Work on Floor(s): 005
|
| 08/27/2014 |
220401535 |
01 |
A2 |
X SIGNED OFF |
09/28/2016 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER WITH GAS/OIL BURNER ON NYC BOILER NO. MD 929571-01 AND
|
|
Work on Floor(s): CEL
|
| 09/04/2009 |
220026585 |
01 |
A2 |
X SIGNED OFF |
12/28/2010 |
0039622 PE |
PEROTTO |
|
NOT APPLICABLE
|
|
REPLACE GAS PIPING TO ALL APARTMENTS AND RELOCATE GAS METERS TO BE IN CELL
|
|
Work on Floor(s): 001 thru 005
|