 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 10/02/2015 |
240116735 |
PR |
I LAA SIGNED OFF |
10/20/2015 |
MP 001856 |
VITELLO |
|
EXISTING GAS RISER WAS SHUT OFF DUE TO SOMEONE DRILLING A HOLE IN IT. SCOP
|
|
Work on Floor(s): BAS,1ST,2ND,3RD,4TH,5TH
|
| 10/15/2012 |
240012730 |
PR |
E LAA FILED |
10/15/2012 |
MP 001222 |
CRUZ |
|
OIL TO DUEL-FUEL CONVERSION OF BOILER IN BASEMENT OF BUILDING. 1)MANUFACTU
|
|
Work on Floor(s): BAS
|
| 12/07/2006 |
200960585 |
PR |
I LAA SIGNED OFF |
01/02/2007 |
MP 001472 |
GIAMPAPA |
|
REPLACE EXISTING OLD STYLE GAS METER & INSTALL (1) NEW STYLE CLASS 250 GAS
|
|
Work on Floor(s): 002
|
| 04/10/2001 |
200658966 |
PR |
I LAA SIGNED OFF |
04/26/2001 |
MP 000722 |
VITELLO |
|
REPLACING LEAKING GAS PIPING TO COOKING STOVES IN EACH APT. INTALLING NEW
|
|
Work on Floor(s): BAS,001
|
| 03/10/1998 |
200408727 |
PR |
I LAA SIGNED OFF |
03/31/1998 |
MP 001077 |
BRONNER |
|
DUE TO VACANCY: TESTING GAS LINE FOR COOKING
|
| 06/12/1997 |
200420393 |
PR |
I LAA SIGNED OFF |
07/18/1997 |
MP 000114 |
ALPER |
|
TO SUPPLY (20) 3/4 APPLIANCE GAS VALVES ON EACH STOVE. TO REPLACE APPROX.
|
|
Work on Floor(s): 5
|
| 05/28/1997 |
200420277 |
PR |
E LAA FILED |
05/28/1997 |
MP 001252 |
NOTO |
|
TESTING GAS PIPING TO ENTIRE PREMISES. GAS SHUT OFF DUE TO FIRE. REPLACI
|
|
Work on Floor(s): CEL, TH,RU, 5
|