FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
11/06/2019 |
220719284 |
01 |
A2 |
R PERMIT-ENTIRE |
11/08/2019 |
0081186 PE |
BILLAH |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO COMBINE APT 15 AND 16 AT 5TH FLOOR. WORK WILL INCL
|
|
Work on Floor(s): 5TH
|
05/17/2019 |
220703282 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/20/2019 |
0081186 PE |
BILLAH |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE APT 13 AND 14 AT 5TH FLOOR. WORK WILL INC
|
|
Work on Floor(s): 5TH
|
04/22/2019 |
220699439 |
01 |
A2 |
Q PERMIT-PARTIAL |
04/22/2019 |
0081186 PE |
BILLAH |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION TO RENOVATE APT 5 AT 3RD AND 11 AT 4TH FLOOR. WORK WI
|
|
Work on Floor(s): 3RD,4TH
|
06/20/2018 |
200261180 |
03 |
A1 |
P APPROVED |
09/05/2018 |
0093453 PE |
TADDONIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|
04/17/2018 |
220386963 |
01 |
A2 |
X SIGNED OFF |
05/17/2018 |
0087243 PE |
WONG |
|
NOT APPLICABLE
|
|
PLUMBING WORK IN CONJUCTION WITH JOB #200261180 ONLY.
|
|
Work on Floor(s): 001
|
03/24/2017 |
200261180 |
02 |
A1 |
P APPROVED |
02/05/2018 |
0085457 PE |
DANCE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|
06/01/2015 |
220457618 |
01 |
A2 |
X SIGNED OFF |
08/19/2016 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO. MD924013-01) WITH BOILER AND
|
|
Work on Floor(s): CEL
|
05/29/2013 |
240026379 |
01 |
A2 |
X SIGNED OFF |
11/23/2015 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
RE-PIPE GAS PIPING FOR ENTIRE BUILDING AS PER PLANS. FILED IN CONJUNCTION
|
|
Work on Floor(s): CEL 001 thru 005
|
06/25/1993 |
200261180 |
01 |
A1 |
R PERMIT-ENTIRE |
11/19/2018 |
0093453 PE |
TADDONIO |
|
NOT APPLICABLE
|
|
CHANGE USE OF LIVING AREA USED IN CONJ UNCTION TO EXISTING STORE ON
|
|
Work on Floor(s): 1
|