 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 10/16/2012 |
240012794 |
PR |
E LAA FILED |
10/16/2012 |
MP 001222 |
CRUZ |
|
OIL TO DUEL-FUEL CONVERSION OF BOILER IN BASEMENT OF BUILDING. 1) MANUFACT
|
|
Work on Floor(s): BAS
|
| 06/29/1999 |
200454891 |
PR |
I LAA SIGNED OFF |
11/08/1999 |
MP 000722 |
VITELLO |
|
TESTING EXISTING GAS PIPING TO 20 APARTMENTS
|
|
Work on Floor(s): BAS, 1, 2 3, 4, 5 6
|
| 02/19/1999 |
200495669 |
PR |
I LAA SIGNED OFF |
03/08/1999 |
MP 000166 |
DECOLA |
|
REPIPE 3/4" GAS LINE FROM METER IN BASEMENT TO GAS RANGE IN KITCHEN APARTM
|