| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/24/2024 |
201199363 |
02 |
A2 |
P APPROVED |
01/24/2024 |
|
EID |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,CEL,001,004,ROF
|
| 03/22/2022 |
201203893 |
02 |
A3 |
P APPROVED |
03/22/2022 |
|
KHAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF (+/-) 1823 L.FT TEMPORARY C
|
|
Work on Floor(s): OSP
|
| 03/05/2021 |
201029859 |
04 |
A2 |
P APPROVED |
03/05/2021 |
|
NICHOLSO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,001,ROF
|
| 02/25/2021 |
201203063 |
03 |
A2 |
P APPROVED |
02/25/2021 |
|
VOYTKO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 UPGRADE OF EXISTING SCHOOL AUDITORIUM WITH
|
|
Work on Floor(s): 001
|
| 02/16/2021 |
201029555 |
02 |
A2 |
P APPROVED |
02/16/2021 |
|
SHENOY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/29/2021 |
201203063 |
02 |
A2 |
P APPROVED |
01/29/2021 |
0099607 PE |
VOYTKO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 12/26/2019 |
201203893 |
01 |
A3 |
X SIGNED OFF |
05/19/2025 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF (+/-) 1823 L.FT TEMPORARY CONSTRUCTION FENCE AS INDICATED
|
|
Work on Floor(s): OSP
|
| 12/26/2019 |
201203900 |
01 |
A3 |
X SIGNED OFF |
07/11/2024 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD (+/-)933'-0" LONG AND (+/-)78'-0" HIGH ON GR
|
|
Work on Floor(s): OSP
|
| 11/26/2019 |
201203679 |
01 |
A3 |
R PERMIT-ENTIRE |
12/07/2023 |
0072587 PE |
KHAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF (+/-)1393 L.FT NEW SIDEWALK SHED AS INDICATED ON PLANS IN
|
|
Work on Floor(s): OSP
|
| 09/06/2019 |
201203063 |
01 |
A2 |
R PERMIT-ENTIRE |
04/11/2024 |
0099607 PE |
VOYTKO |
|
NOT APPLICABLE
|
|
UPGRADE OF EXISTING SCHOOL AUDITORIUM WITH OUT CHANGES TO SEATING LAYOUT.
|
|
Work on Floor(s): 001
|
| 04/19/2019 |
201199363 |
01 |
A2 |
R PERMIT-ENTIRE |
03/13/2025 |
0073979 PE |
EID |
|
NOT APPLICABLE
|
|
PS118X_PROPOSED WORK IS TO INCLUDE REMOVAL & RECONSTRUCTION OF EXTERIOR MA
|
|
Work on Floor(s): OSP,CEL,001,004,ROF
|
| 05/24/2018 |
201197677 |
01 |
A3 |
X SIGNED OFF |
12/08/2025 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
SH/MS118X - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED) SUBMITTING ON BEHA
|
|
Work on Floor(s): OSP
|
| 04/25/2014 |
200543313 |
04 |
PA |
P APPROVED |
04/25/2014 |
0057604 PE |
SZATKOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|
| 02/13/2014 |
201029859 |
03 |
A2 |
P APPROVED |
02/13/2014 |
|
NICHOLSO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF (2) STEEL LADDERS AND THE E
|
|
Work on Floor(s): OSP,001,ROF
|
| 01/23/2014 |
201191307 |
01 |
A3 |
X SIGNED OFF |
10/27/2015 |
0064399 PE |
ERFANI |
|
NOT APPLICABLE
|
|
ERECT TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH APPLICATION # 2010
|
|
Work on Floor(s): OSP
|
| 12/20/2013 |
200467413 |
08 |
A2 |
P APPROVED |
12/20/2013 |
0576041 PE |
SZATKOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,LAR 001 thru 004
|
| 06/04/2013 |
201029859 |
02 |
A2 |
X SIGNED OFF |
06/10/2021 |
0061890 PE |
RAJNIKAN |
|
NOT APPLICABLE
|
|
APPLICATION HEREWITH FOR THE EXCAVATION AND FOUNDATION WORK IN CONJUNCTION
|
|
Work on Floor(s): OSP,001
|
| 06/04/2013 |
201029859 |
01 |
A2 |
X SIGNED OFF |
06/10/2021 |
0015015 RA |
NICHOLSO |
|
NOT APPLICABLE
|
|
INSTALLATION OF (2) STEEL LADDERS AND THE EXTERIOR ACCESS RAMP AS PER PLAN
|
|
Work on Floor(s): OSP,001,ROF
|
| 04/19/2013 |
201029555 |
01 |
A2 |
X SIGNED OFF |
02/24/2021 |
0055232 PE |
SHENOY |
|
NOT APPLICABLE
|
|
REPLACEMENT OF SMOKE PURGE FAN AND RE-CONNECION TO EXISTING FIRE ALARM SYS
|
|
Work on Floor(s): 001
|
| 07/02/2012 |
201023828 |
03 |
A2 |
P APPROVED |
07/02/2012 |
|
CHU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 03/01/2012 |
201026308 |
05 |
A2 |
P APPROVED |
03/01/2012 |
|
GOLDMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001
|
| 05/03/2011 |
201026308 |
04 |
A2 |
P APPROVED |
05/03/2011 |
|
GOLDMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): BAS,001
|
| 10/08/2010 |
201026308 |
03 |
A2 |
P APPROVED |
10/08/2010 |
|
DONOVAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 REMOVE AND REPLACE ASPHALT PAVING AND SUBST
|
|
Work on Floor(s): BAS,1ST
|
| 10/05/2010 |
201024630 |
03 |
A2 |
P APPROVED |
10/05/2010 |
|
TING |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003
|
| 09/28/2010 |
201027450 |
01 |
A3 |
X SIGNED OFF |
03/06/2012 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
JHS118X FENCE SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF
|
|
Work on Floor(s): OSP
|
| 04/30/2010 |
201026308 |
01 |
A2 |
X SIGNED OFF |
06/21/2012 |
0018880 RA |
DONOVAN |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE ASPHALT PAVING AND SUBSTRATE. REMOVE AND REPLACE EXISTI
|
|
Work on Floor(s): BAS,1ST
|
| 04/30/2010 |
201026308 |
02 |
A2 |
X SIGNED OFF |
06/21/2012 |
0069356 PE |
GOLDMAN |
|
NOT APPLICABLE
|
|
REPLACING 8 YARD DRAIN, 3 AREAWAY DRAINS, INSTALLING 2 SUMP PUMPS, AND ALL
|
|
Work on Floor(s): CEL,001
|
| 06/09/2009 |
201023828 |
02 |
A2 |
P APPROVED |
06/09/2009 |
|
CHU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 04/16/2009 |
201024630 |
02 |
A2 |
X SIGNED OFF |
09/27/2011 |
0602931 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
JS118 LIBRARY UPGRADE MH WORK INCLUDES: REMOVAL & REPLACING 2 UNIT VENTILA
|
|
Work on Floor(s): 003
|
| 04/16/2009 |
201024630 |
01 |
A2 |
X SIGNED OFF |
09/27/2011 |
0014698 RA |
TING |
|
NOT APPLICABLE
|
|
JS118 LIBRARY UPGRADE RM 315 & EXPANSION TO CLASSRM 319 W/DEMO, CUSTOM MIL
|
|
Work on Floor(s): 003
|
| 01/13/2009 |
201023828 |
01 |
A2 |
X SIGNED OFF |
12/20/2012 |
0046632 PE |
CHU |
|
NOT APPLICABLE
|
|
JS118 REPLACE A/C UNIT W/ NEW SPLIT SYSTEM A/C
|
|
Work on Floor(s): 002
|
| 06/03/2008 |
200467413 |
07 |
A2 |
P APPROVED |
06/03/2008 |
0576041 PE |
SZATKOWS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,LAR 001 thru 004
|
| 04/08/2008 |
201014446 |
01 |
A2 |
X SIGNED OFF |
10/14/2009 |
0062284 PE |
JAGIELLO |
|
NOT APPLICABLE
|
|
J.H.S,/I.S. 118-X:MECHANICAL WORKS INCLUDING & NOT LIMITED TO NEW DDC CONT
|
|
Work on Floor(s): CEL 1 thru 4
|
| 06/22/2006 |
200467413 |
06 |
A2 |
P APPROVED |
06/22/2006 |
0009550 RA |
GOMEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,LAR 001 thru 004
|
| 03/02/2006 |
200896959 |
01 |
A2 |
X SIGNED OFF |
04/07/2006 |
0065570 PE |
SHAMES |
|
NOT APPLICABLE
|
|
IS118 INSTALL TEMP FUEL OIL TANK(DOUBLED WALLED)TO SUPPLY OIL TO TEMP BL
|
|
Work on Floor(s): CEL
|
| 04/05/2005 |
200555032 |
09 |
A2 |
P APPROVED |
04/05/2005 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,LAR
|
| 10/19/2004 |
200555032 |
08 |
A2 |
P APPROVED |
10/19/2004 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,LAR
|
| 08/31/2004 |
200555032 |
07 |
A2 |
P APPROVED |
08/31/2004 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,LAR
|
| 08/23/2004 |
200555032 |
06 |
A2 |
P APPROVED |
08/23/2004 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,LAR
|
| 04/16/2004 |
200555032 |
05 |
A2 |
P APPROVED |
04/16/2004 |
0067900 PE |
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,LAR
|