| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/16/2017 |
220538988 |
03 |
A2 |
P APPROVED |
11/16/2017 |
|
FU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 01/09/2017 |
220538988 |
02 |
A2 |
P APPROVED |
01/12/2017 |
|
FU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 08/18/2016 |
220538988 |
01 |
A2 |
X SIGNED OFF |
03/22/2018 |
0090920 PE |
FU |
|
NOT APPLICABLE
|
|
INSTALL TWO (2) NEW BOILERS (WEIL-MCLAIN GAS FIRED SPACE HEATING BOILERS M
|
|
Work on Floor(s): CEL
|
| 10/30/2014 |
220412729 |
01 |
A2 |
J P/E DISAPPROVED |
11/10/2014 |
0029465 RA |
TEHN-ADD |
|
NOT APPLICABLE
|
|
JOB FILED TO DO MINOR CONSTRUCTION IN THE REPLACEMENT OF 3 EXISTING BOIL
|
|
Work on Floor(s): 001
|