| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/25/2024 |
240349912 |
02 |
A2 |
P APPROVED |
11/27/2024 |
|
ANANTHAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 07/06/2023 |
240349912 |
01 |
A2 |
X SIGNED OFF |
05/30/2025 |
0036233 RA |
ANANTHAK |
|
NOT APPLICABLE
|
|
INSTALLATION OF 36.5 KW SOLAR ENERGY SYSTEM ON ROOF. NO CHANGE OF OCCUPANC
|
|
Work on Floor(s): ROF
|
| 03/22/2019 |
240250615 |
01 |
A2 |
R PERMIT-ENTIRE |
03/26/2019 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER ON EXISTING LOW PRESSURE BOILER.
|
|
Work on Floor(s): CEL
|
| 03/04/2010 |
220050502 |
01 |
A3 |
X SIGNED OFF |
09/29/2010 |
0028992 RA |
MOGLINO |
|
NOT APPLICABLE
|
|
RELOCATING EXISTING AND INSTALLING ADDITIONAL TELECOMMUNICATIONS ANTENNAS
|
|
Work on Floor(s): 001
|
| 08/28/2000 |
200636614 |
01 |
A2 |
X SIGNED OFF |
04/25/2002 |
0058978 PE |
ATLURU |
|
NOT APPLICABLE
|
|
CREATING TELECOMMUNICATION RM WITH HVAC IN BASEMENT.RELATED ANTENNAS AND
|
|
Work on Floor(s): ROF,BAS
|