 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/14/2017 |
220606690 |
01 |
A3 |
P APPROVED |
08/01/2017 |
0025617 RA |
CONCEPCI |
|
NOT APPLICABLE
|
|
FILING PLAN TO RESOLVE ECB VIOLATION NUMBER 35173509X; INSTALL SHEETROCK C
|
|
Work on Floor(s): 001
|
| 07/07/1999 |
200436411 |
06 |
A1 |
P APPROVED |
07/07/1999 |
0015470 RA |
PERLMUTT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BMT 001 thru 005
|
| 05/11/1999 |
200436411 |
05 |
A1 |
P APPROVED |
05/13/1999 |
0015470 RA |
PERLMUTT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BMT 001 thru 005
|
| 05/11/1999 |
200436411 |
04 |
A1 |
P APPROVED |
05/13/1999 |
0052617 PE |
KWALBRUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): BMT 001 thru 005
|
| 01/02/1998 |
200485590 |
01 |
A3 |
R PERMIT-ENTIRE |
03/31/1998 |
|
LOWENTHI |
|
NOT APPLICABLE
|
|
IN CONJUNCTION WITH ALT 1 200436411.
|
|
Work on Floor(s): BMT 001 thru 005
|
| 12/18/1997 |
200436411 |
03 |
A1 |
X SIGNED OFF |
09/08/2000 |
0052617 PE |
KWALBRUN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF PLUMBING,MECHANIC AL AND BOILER SYSTEMS.
|
|
Work on Floor(s): BMT 001 thru 005
|
| 12/17/1997 |
200436411 |
02 |
A1 |
X SIGNED OFF |
09/08/2000 |
0046161 PE |
KAPLAN |
|
NOT APPLICABLE
|
|
STRUCTURAL MODIFICATIONS
|
|
Work on Floor(s): BMT 001 thru 005
|
| 11/07/1997 |
200436411 |
01 |
A1 |
X SIGNED OFF |
09/08/2000 |
0015470 RA |
PERLMUTT |
|
NOT APPLICABLE
|
|
COMBINING THREE ADJACENT BUILDINGS INTO ONE MIXED USE BUILDING.INTERIOR
|
|
Work on Floor(s): BMT 001 thru 005
|