 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/02/2022 |
240313709 |
01 |
A3 |
R PERMIT-ENTIRE |
11/21/2022 |
0026633 RA |
KATZ |
|
NOT APPLICABLE
|
|
BPP FILING IN CONJUNCTION WITH NB APPLICATION #X00591267-I1 & X00591262-I1
|
|
Work on Floor(s): OSP
|
| 03/12/2020 |
220728452 |
01 |
A2 |
X SIGNED OFF |
11/23/2020 |
0035834 RA |
TCHILING |
|
NOT APPLICABLE
|
|
SCOPE OF WORK ONLY ON THE SECOND FLOOR.NO WORK IN BASEMENT AND OR FIRST FL
|
|
Work on Floor(s): 002
|
| 10/25/2012 |
220239034 |
01 |
A2 |
P APPROVED |
11/07/2012 |
0013322 RA |
TSUE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/13/2023 LEGALIZATION OF 3 BATH ROOM FIXTURES AT FIRST FLO
|
|
Work on Floor(s): 001
|
|
210118807 |
01 |
A1 |
3 SUSPENDED |
09/10/2010 |
0013322 RA |
TSUE |
|
NOT APPLICABLE
|
|
TO CONVERT TWO DWELLING UNITS INTO THREE DWELLING UNITS.A NEW C OF O.
|
|
Work on Floor(s): BAS,001,002
|