 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/27/2013 |
240033478 |
01 |
A3 |
X SIGNED OFF |
05/14/2014 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
PROPOSED REPLACEMENT OF WINDOW LINTELS AND BRICK POINTING WORK AS PER PLAN
|
|
Work on Floor(s): ROF 001 thru 006
|
| 10/29/1993 |
200271785 |
01 |
A2 |
X SIGNED OFF |
01/10/1994 |
0007310 RA |
WESTPHAL |
|
NOT APPLICABLE
|
|
INSTALL NEW METAL CHUTE FOR EXISTING REF USE COMPACTOR FILED IN
|
|
Work on Floor(s): CEL 1 thru 6
|
| 03/23/1993 |
200252163 |
01 |
A2 |
X SIGNED OFF |
01/10/1994 |
0007310 RA |
WESTPHAL |
|
NOT APPLICABLE
|
|
INSTALL REFUSE COMPACTOR IN EXISTING INCINERATOR ROOM.
|
|
Work on Floor(s): CEL
|