| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/14/2021 |
240250660 |
03 |
A2 |
P APPROVED |
06/30/2021 |
|
JOHNSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 02/26/2020 |
240250660 |
02 |
A2 |
P APPROVED |
02/26/2020 |
|
JOHNSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 03/29/2019 |
240250660 |
01 |
A2 |
X SIGNED OFF |
07/06/2021 |
0095511 PE |
JOHNSON |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): FAC
|
| 10/04/2016 |
240158039 |
01 |
A2 |
P APPROVED |
10/04/2016 |
0072696 PE |
SILBERMA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/09/2019 FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHA
|
|
Work on Floor(s): FAC
|
| 07/03/2013 |
240029447 |
01 |
A3 |
R PERMIT-ENTIRE |
07/08/2013 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
PROPOSED BRICK REPLACEMENT AS PER PLANS.SIDEWALK SHED FILED UNDER SEPARATE
|
|
Work on Floor(s): 006,ROF
|
| 07/03/2012 |
220193118 |
01 |
A3 |
R PERMIT-ENTIRE |
07/03/2012 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
PROPOSED WINDOW LINTEL, SILL REPLACE, BRICK WORK AND BRICK POINTING AS PER
|
|
Work on Floor(s): 001 thru 006
|
| 04/28/2011 |
220114748 |
01 |
A3 |
R PERMIT-ENTIRE |
05/02/2011 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
PROPOSED POINTING WORK ONLY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): 006
|
| 03/23/2011 |
220109521 |
01 |
A3 |
R PERMIT-ENTIRE |
03/25/2011 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS
|
|
Work on Floor(s): OSP
|
| 05/26/1994 |
200241620 |
01 |
A2 |
X SIGNED OFF |
09/27/1994 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
CONVERT EXIST' BOILER FROM HOT WATER TO- STEAM OPERATION. INSTALL STEAM
|
|
Work on Floor(s): CEL
|
| 12/31/1992 |
200232569 |
01 |
A3 |
P APPROVED |
01/08/1993 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
APPLICATION FILED TO CORRECT COST FOR PU RPOSES OF J-51 FILING OLD
|
|
Work on Floor(s): CEL 1 thru 6
|
| 07/10/1992 |
200106376 |
06 |
A1 |
P APPROVED |
03/30/1993 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1, TRU,6
|
| 06/17/1992 |
200106376 |
05 |
A1 |
P APPROVED |
06/18/1992 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1, TRU,6
|
| 05/27/1992 |
200106376 |
04 |
A1 |
P APPROVED |
06/02/1992 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1, TRU,6
|
| 06/13/1991 |
200106376 |
03 |
A1 |
R PERMIT-ENTIRE |
06/13/1991 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
GUT REHABILATION OF EXISTING 6 STORY BLDG
|
|
Work on Floor(s): CEL,1, TRU,6
|
| 06/05/1991 |
200106376 |
02 |
A1 |
R PERMIT-ENTIRE |
02/27/1992 |
0058601 PE |
ASHKENAZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW HOT WATER, HEATING S YSTEM, BOILER HOT WATER DIS
|
|
Work on Floor(s): CEL,1, TRU,6
|
| 03/19/1991 |
200106376 |
01 |
A1 |
X SIGNED OFF |
08/07/1992 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
GUT REHAB. OF EXISTING 6 STORY M.D.
|
|
Work on Floor(s): CEL,1, TRU,6
|