| 11/19/2020 |
240292250 |
01 |
A2 |
P APPROVED |
11/19/2020 |
0032789 RA |
AUFGANG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/19/2021 ROOF MEMBRANE SYSTEM REPAIRS IN CONJUNCTION WITH
|
|
Work on Floor(s): ROO
|
| 09/12/2019 |
220650436 |
03 |
A2 |
P APPROVED |
09/18/2019 |
|
WONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 06/11/2018 |
220650436 |
02 |
A2 |
X SIGNED OFF |
08/12/2020 |
0091835 PE |
WONG |
|
NOT APPLICABLE
|
|
REPLACEMENT OF KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGHING.
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 06/11/2018 |
220650436 |
01 |
A2 |
X SIGNED OFF |
08/12/2020 |
0032789 RA |
AUFGANG |
|
NOT APPLICABLE
|
|
MODERATE REHABILITATION OF KITCHENS AND BATHROOMS, EXTERIOR FA?ADE REPAIRS
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 10/02/2015 |
240083805 |
03 |
A2 |
P APPROVED |
10/02/2015 |
|
MESZAROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NATURAL GAS CONVERSION, AND INSTALLATION OF
|
|
Work on Floor(s): CEL
|
| 06/19/2015 |
240083805 |
02 |
A2 |
P APPROVED |
10/02/2015 |
|
MESZAROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 12/11/2014 |
240083805 |
01 |
A2 |
X SIGNED OFF |
08/24/2017 |
0088892 PE |
MESZAROS |
|
NOT APPLICABLE
|
|
NATURAL GAS CONVERSION, AND INSTALLATION OF NEW BURNER, BOILER, AND NEW CH
|
|
Work on Floor(s): CEL
|
| 12/19/2013 |
240045198 |
01 |
A3 |
R PERMIT-ENTIRE |
02/25/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 07/24/2013 |
220326635 |
01 |
A2 |
R PERMIT-ENTIRE |
11/26/2013 |
0038618 PE |
ROSENBAU |
|
NOT APPLICABLE
|
|
STUCCO REMOVAL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR
|
|
Work on Floor(s): FAC,ROF
|
| 08/19/1994 |
200248767 |
01 |
A2 |
R PERMIT-ENTIRE |
04/18/1995 |
0045629 PE |
TIETJEN |
|
NOT APPLICABLE
|
|
INSTALL FIRE ALARM SYSTEM. NO CHANGE IN- USE EGRESS OCC.
|
|
Work on Floor(s): CEL,001
|
| 08/19/1994 |
200248758 |
01 |
A2 |
Q PERMIT-PARTIAL |
05/03/1995 |
0045629 PE |
TIETJEN |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER SYSTEM. FILED IN CONJ. NO CHANGE IN USE EGRESS OCC.
|
|
Work on Floor(s): CEL,001
|
| 08/19/1994 |
200248749 |
01 |
A2 |
Q PERMIT-PARTIAL |
01/04/1995 |
0172851 RA |
GEDDIS |
|
NOT APPLICABLE
|
|
GENERAL CONSTRUCTION WORK FOR INTERIOR - OFFICE RENOVATION. NO CHANGE IN
|
|
Work on Floor(s): CEL,001
|
| 08/19/1994 |
200248749 |
02 |
A2 |
Q PERMIT-PARTIAL |
01/04/1995 |
0045629 PE |
TIETJEN |
|
NOT APPLICABLE
|
|
INSTALL PLUMBING, MECH. & BOILER SYSTEM. NO CHANGE IN USE EGRESS OCC.
|
|
Work on Floor(s): CEL,001
|
| 10/10/1991 |
200163401 |
01 |
A2 |
P APPROVED |
10/30/1991 |
0014807 RA |
LITCHFIE |
|
NOT APPLICABLE
|
|
RELOCATE F.E. DROP LADDER FROM FRONT OF BLDG. TO REAR COURT. EXTEND EXIS
|
|
Work on Floor(s): CEL,001,002,003,TRU,006
|
| 03/14/1990 |
200029174 |
01 |
A2 |
X SIGNED OFF |
09/28/1990 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL BOILER, OIL BURNER AND FUEL OIL TANK. STRUCTURAL STABILITY OF
|
|
Work on Floor(s): BAS
|