FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
11/21/2017 |
240111990 |
02 |
A3 |
P APPROVED |
11/24/2017 |
0094567 RA |
HAIDER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
08/29/2015 |
240111990 |
01 |
A3 |
R PERMIT-ENTIRE |
09/02/2015 |
0094567 RA |
HAIDER |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
07/09/2015 |
220457583 |
01 |
A2 |
X SIGNED OFF |
09/14/2016 |
0078958 PE |
COHEN |
|
NOT APPLICABLE
|
|
REPLACE (1) LOW PRESSURE GAS FIRED BOILER. CONNECT TO EXISTING GAS PIPING
|
|
Work on Floor(s): 001
|
01/21/2015 |
220423986 |
01 |
A2 |
X SIGNED OFF |
06/19/2018 |
0057210 PE |
WAPNER |
|
NOT APPLICABLE
|
|
BRICK POINTING ,PARAPET REPAIR COPING REPAIR AND / OR REPLACEMENT. WINDOWS
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
12/01/2014 |
240079829 |
01 |
A2 |
X SIGNED OFF |
11/02/2016 |
0032789 RA |
AUFGANG |
|
NOT APPLICABLE
|
|
MODERATE RENOVATION OF THE 6 STORY BUILDING FOR THE REPLACEMENT OF EXISTIN
|
|
Work on Floor(s): ROF,CEL 001 thru 006
|
10/01/2013 |
220284074 |
02 |
A2 |
P APPROVED |
10/02/2013 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 NEW SCOPE: REPLACE (3) GAS-FIRED BOILERS. N
|
|
Work on Floor(s): 1ST
|
04/04/2013 |
220284074 |
01 |
A2 |
R PERMIT-ENTIRE |
04/05/2013 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
NEW SCOPE: REPLACE (3) GAS-FIRED BOILERS. NO CHANGE IN USE, EGRESS OR OCCU
|
|
Work on Floor(s): 1ST
|
12/01/2008 |
210081132 |
01 |
A2 |
R PERMIT-ENTIRE |
11/28/2012 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE GAS BOILER.
|
|
Work on Floor(s): CEL
|