| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
08/20/2021 |
240308234 |
01 |
A2 |
X SIGNED OFF |
07/27/2022 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): ROF
|
10/31/2017 |
220550286 |
01 |
A2 |
R PERMIT-ENTIRE |
02/02/2018 |
0084330 PE |
LANDAURO |
|
NOT APPLICABLE
|
|
FILING FOR FACADE RESTORATION WORK THAT INCLUDES REPLACEMENT OF MASONRY P
|
|
Work on Floor(s): FAC
|
07/13/2017 |
240189568 |
01 |
A3 |
R PERMIT-ENTIRE |
07/09/2018 |
0094567 PE |
HAIDER |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
08/07/2015 |
240091146 |
02 |
A2 |
P APPROVED |
08/10/2015 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
03/04/2015 |
240091146 |
01 |
A2 |
X SIGNED OFF |
01/20/2016 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. NO CHANGE IN
|
|
Work on Floor(s): OSP
|
06/17/2009 |
220012331 |
01 |
A2 |
X SIGNED OFF |
09/21/2009 |
0020478 RA |
LEDER-LU |
|
NOT APPLICABLE
|
|
REPIPE ENTIRE BUILDING WITH BLACK IRON FOR EXISTING DOMESTIC GAS RANGES AN
|
|
Work on Floor(s): 001 thru 005
|
10/10/1990 |
200082098 |
01 |
A3 |
X SIGNED OFF |
10/15/1991 |
0024794 PE |
GALLIN |
|
NOT APPLICABLE
|
|
ERECT RELIEVING PARTITIONS IN B LINE AT BATHROOMS. NO CHANGE IN USE,
|
|
Work on Floor(s): CEL,TRU,5
|