| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/28/2017 |
220140693 |
02 |
A2 |
P APPROVED |
07/28/2017 |
0056831 PE |
MOTWANI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001,CEL
|
| 07/14/2017 |
220606583 |
01 |
A2 |
R PERMIT-ENTIRE |
07/26/2017 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
FILING TO MODIFY FIRE SUPPRESSION SYSTEM. NO OTHER WORK TO BE DONE. NO C
|
|
Work on Floor(s): 001
|
| 02/02/2017 |
220581323 |
01 |
A2 |
R PERMIT-ENTIRE |
02/16/2017 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
INSTALLING NEW FIRE SUPPRESSION SYSTEM ONLY. NO OTHER WORK TO BE DONE. N
|
|
Work on Floor(s): 001
|
| 04/23/2012 |
220140693 |
01 |
A2 |
R PERMIT-ENTIRE |
08/24/2017 |
0056831 PE |
MOTWANI |
|
NOT APPLICABLE
|
|
PLUMBING WORK IN EXISTING STORE INSTALL PL FIXTURES ALL AS PER PLAN SUBMIT
|
|
Work on Floor(s): 001,CEL
|
| 12/02/2010 |
220095322 |
01 |
A2 |
X SIGNED OFF |
06/06/2011 |
0074869 PE |
KHANZADA |
|
NOT APPLICABLE
|
|
BRICK POINTING AT FRONT AND PARAPET WALL REPAIR AT EAST TREMONT AVENUE AND
|
|
Work on Floor(s): OSP,ROF
|
| 07/08/2005 |
200980046 |
01 |
A2 |
Q PERMIT-PARTIAL |
08/04/2005 |
0013529 RA |
KATZ |
|
NOT APPLICABLE
|
|
INSTALL FIRE SUPPRESSION SYSTEM ONLY.NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 001
|