| 05/31/2017 |
220599449 |
01 |
A2 |
R PERMIT-ENTIRE |
03/30/2020 |
0058291 PE |
EPSTEIN |
|
NOT APPLICABLE
|
|
FACADE REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, GROUP, O
|
|
Work on Floor(s): FAC
|
| 03/23/2017 |
240177367 |
01 |
A3 |
R PERMIT-ENTIRE |
12/13/2022 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF.
|
|
Work on Floor(s): OSP
|
| 03/20/2017 |
240177278 |
01 |
A3 |
H P/E IN PROCESS |
03/20/2017 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 05/19/2017 INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PL
|
|
Work on Floor(s): OSP
|
| 06/03/2011 |
220121794 |
01 |
A3 |
X SIGNED OFF |
01/19/2012 |
0078124 PE |
SIDDIQUI |
|
NOT APPLICABLE
|
|
FACADE REPAIR AS SHOWN ON PLANS. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001 thru 006
|
| 07/17/2008 |
210059201 |
01 |
A3 |
X SIGNED OFF |
10/21/2009 |
0020419 RA |
HULME |
|
NOT APPLICABLE
|
|
ERECT PIPE SCAFFOLD AS PER PLAN AT 240 ECHO PLACE. DURING REMEDIAL REPAIRS
|
|
Work on Floor(s): OSP
|
| 06/08/2007 |
201130427 |
01 |
A2 |
R PERMIT-ENTIRE |
06/08/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
REPAIR PARAPET WALL IN APPROXIMATE AREA OF 100 L.F. X 7 L.F. SIDEWALK SHED
|
|
Work on Floor(s): OSP
|
| 06/05/2007 |
201129876 |
01 |
A3 |
R PERMIT-ENTIRE |
06/05/2007 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 100 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 02/12/2002 |
200713371 |
01 |
A3 |
R PERMIT-ENTIRE |
02/19/2002 |
OT |
Hama |
|
NOT APPLICABLE
|
|
Erect 20' of Temporary Heavy Duty Sidewalk Shd 300 psf
|
|
Work on Floor(s): 1
|
| 04/10/2001 |
200666163 |
01 |
A3 |
R PERMIT-ENTIRE |
04/11/2001 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED,100'DUR ING FACADE REPAIR. NO CHANGE IN
|
|
Work on Floor(s): GRD
|