 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 08/12/2022 |
240334394 |
01 |
A2 |
R PERMIT-ENTIRE |
09/13/2022 |
0036233 RA |
ANANTHAK |
|
NOT APPLICABLE
|
|
INSTALLATION OF 32.04 KW SOLAR ENERGY SYSTEM ON ROOF. NO CHANGE OF OCCUPAN
|
|
Work on Floor(s): ROF
|
| 07/19/2021 |
240306664 |
01 |
A2 |
R PERMIT-ENTIRE |
08/17/2021 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANEL ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRES
|
|
Work on Floor(s): ROO,CEL
|
| 07/08/2021 |
240306637 |
01 |
A2 |
D A/P ENTIRE |
07/08/2021 |
0021633 RA |
STOUT |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/08/2021 INSTALLATION OF SOLAR PANELS ON EXISITNG ROOF STR
|
|
Work on Floor(s): ROO,CEL
|
| 04/05/2016 |
220411917 |
01 |
A3 |
X SIGNED OFF |
08/12/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
REPLACE WINDOW LINTELS AT FRONT OF BUILDING AS PER DRAWINGS. NO CHANGE IN
|
|
Work on Floor(s): 001 thru 006
|
| 02/29/2016 |
240133609 |
01 |
A3 |
X SIGNED OFF |
09/13/2016 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 07/22/2010 |
220073408 |
01 |
A3 |
R PERMIT-ENTIRE |
07/23/2010 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 08/19/2009 |
220024015 |
01 |
A3 |
X SIGNED OFF |
01/24/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIR
|
|
Work on Floor(s): OSP
|
| 08/14/2009 |
220023365 |
01 |
A2 |
X SIGNED OFF |
03/08/2011 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
BRICK POINTING APROX 1500 SQFT, BRICK REPAIR ON PARAPET WALL AND ROOF WORK
|
|
Work on Floor(s): ROF 001 thru 006
|