| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/05/2017 |
240197103 |
01 |
A2 |
X SIGNED OFF |
01/19/2018 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
ACTIVATE GAS PORTION OF EXISTING GAS/OIL BURNER ON EXISTING LOW PRESSURE B
|
|
Work on Floor(s): CEL
|
| 08/08/2017 |
240193036 |
01 |
A2 |
X SIGNED OFF |
12/14/2017 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
INSTALL NEW CHIMNEY LINER PER PLAN. CREATE NEW GAS METER ROOM PER PLAN.
|
|
Work on Floor(s): CEL,ROF
|
| 03/20/2017 |
220472931 |
06 |
A2 |
P APPROVED |
03/23/2017 |
|
SKALAFUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,005
|
| 02/22/2017 |
220472931 |
05 |
A2 |
P APPROVED |
02/22/2017 |
|
SKALAFUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,005
|
| 08/12/2016 |
220472931 |
04 |
A2 |
P APPROVED |
08/12/2016 |
|
SKALAFUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,005
|
| 07/14/2016 |
220472931 |
03 |
A2 |
P APPROVED |
01/19/2017 |
|
SKALAFUR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 GAS AND WATER RE PIRE OF ENTIRE BUILDING. R
|
|
Work on Floor(s): BAS,001,002,003,004,005
|
| 10/23/2015 |
220472931 |
02 |
A2 |
P APPROVED |
10/27/2015 |
|
LEDER-LU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,001,002,003,004,005
|
| 08/07/2015 |
220472931 |
01 |
A2 |
X SIGNED OFF |
07/03/2017 |
0058851 PE |
SKALAFUR |
|
NOT APPLICABLE
|
|
GAS AND WATER RE PIRE OF ENTIRE BUILDING. RENOVATION OF STORE. PLUMBING PA
|
|
Work on Floor(s): BAS,001,002,003,004,005
|
| 07/13/2015 |
240106167 |
01 |
A3 |
X SIGNED OFF |
08/30/2016 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
PROPOSED REPLACE PARAPET WALL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS
|
|
Work on Floor(s): ROF
|
| 06/29/2015 |
240104711 |
01 |
A3 |
X SIGNED OFF |
08/30/2016 |
0080350 PE |
SOLTANIZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 04/19/2010 |
220056837 |
01 |
A3 |
R PERMIT-ENTIRE |
04/19/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
REPAIR/REPLACE PARAPET WALL IN THE FRONT PLAN. NO CHANGE IN USE OCCUPANCY
|
|
Work on Floor(s): ROF
|
| 03/09/2010 |
220051226 |
01 |
A3 |
R PERMIT-ENTIRE |
03/09/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED REPLACEMENT OF WINDOW LINTELS AS PER PLAN. NO CHANGE IN USE OCCUP
|
|
Work on Floor(s): OSP
|
| 02/24/2010 |
220050101 |
01 |
A3 |
R PERMIT-ENTIRE |
02/24/2010 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMIDIAL REPAIR
|
|
Work on Floor(s): OSP
|
| 11/10/2009 |
220036529 |
01 |
A2 |
R PERMIT-ENTIRE |
01/29/2010 |
0018684 RA |
ALBERT |
|
NOT APPLICABLE
|
|
PROPOSED NEW KITCHEN EQUIPMENT TO EXISTION DELI GROSERY. "NO CHANGE IN US
|
|
Work on Floor(s): 001
|
| 06/02/2008 |
210052967 |
01 |
A2 |
Q PERMIT-PARTIAL |
07/22/2009 |
0065024 PE |
FLAQUER |
|
NOT APPLICABLE
|
|
INSTALLATION OF A FIRE SUPPRESSION SYSTEM. HOOD AND DUCT WORK. NO CHANGE I
|
|
Work on Floor(s): 01
|
| 08/16/1996 |
200373416 |
01 |
A2 |
R PERMIT-ENTIRE |
08/30/1996 |
0021706 RA |
MCINTOSH |
|
NOT APPLICABLE
|
|
TO ENCLOSE DUMBWAITER SHAFT.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): CEL 001 thru 005
|
| 12/18/1990 |
200088948 |
01 |
A2 |
Q PERMIT-PARTIAL |
01/07/1991 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER. NO CHANGE IN EGRESS, OCC OR USE
|
|
Work on Floor(s): CEL
|