 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/31/2020 |
240271095 |
01 |
A2 |
X SIGNED OFF |
05/26/2021 |
0081461 PE |
DELIC |
|
NOT APPLICABLE
|
|
FACADE REPAIR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): FAC
|
| 03/18/2020 |
240270915 |
01 |
A2 |
H P/E IN PROCESS |
03/18/2020 |
0081461 PE |
DELIC |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/19/2020 FACADE REPAIR AS PER PLANS. NO CHANGE TO USE, EGR
|
|
Work on Floor(s): FAC
|
| 11/10/2010 |
210057533 |
03 |
A2 |
P APPROVED |
12/13/2010 |
|
FERRARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 005
|
| 07/27/2010 |
200996244 |
02 |
A3 |
P APPROVED |
07/27/2010 |
0072827 |
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 06/29/2010 |
210057533 |
02 |
A2 |
P APPROVED |
10/14/2010 |
|
FERRARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 005
|
| 04/15/2010 |
210061207 |
02 |
A2 |
P APPROVED |
05/06/2010 |
|
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 005
|
| 07/29/2008 |
210061207 |
01 |
A2 |
X SIGNED OFF |
03/09/2011 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
REPLACEMENT OF HEATING SYSTEM AND HOT WATER HEATER
|
|
Work on Floor(s): BAS 001 thru 005
|
| 07/11/2008 |
210057533 |
01 |
A2 |
X SIGNED OFF |
12/29/2010 |
0010254 RA |
FERRARA |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING KITCHENS AND BATHS, NEW WINDOWS, NEW ROOF, LINTEL
|
|
Work on Floor(s): BAS 001 thru 005
|
| 09/13/2005 |
200996244 |
01 |
A3 |
X SIGNED OFF |
07/28/2010 |
0072827 RA |
PITERA |
|
NOT APPLICABLE
|
|
Inst 230 l.f. of sidewalk shed for exterior work. No change in use , egres
|
|
Work on Floor(s): 001
|